[
https://issues.apache.org/jira/browse/CAMEL-23518?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Claus Ibsen updated CAMEL-23518:
--------------------------------
Fix Version/s: 4.21.0
> camel-jbang - Refactor TUI trace tab with two-level exchange drill-down
> -----------------------------------------------------------------------
>
> Key: CAMEL-23518
> URL: https://issues.apache.org/jira/browse/CAMEL-23518
> Project: Camel
> Issue Type: Improvement
> Components: camel-jbang
> Reporter: Claus Ibsen
> Priority: Major
> Fix For: 4.21.0
>
>
> Refactor the TUI monitor Trace tab to use a two-level drill-down view.
> Level 1 - Exchange list: Show a table of unique root exchange IDs from the
> trace data with summary info (timestamp, route, status, elapsed). User
> navigates with up/down and presses Enter to drill into a specific exchange.
> Level 2 - Exchange detail: Show the full step-by-step trace for the selected
> exchange, using the same layout as the History tab:
> - Direction arrows (-->/</--/>) with tree indentation via nodeLevel
> - Detail panel with exchange properties (p), variables (v), headers (h), body
> (b) toggles
> - Scrollbar and word wrap (w) support for the detail panel
> - PgUp/PgDn for scrolling
> - F5 to refresh
> - Press Esc to go back to the exchange list
> The data source stays the same (pid-trace.json, appended, incremental read
> via RandomAccessFile), but instead of showing all trace entries in one flat
> table, entries are grouped by exchangeId and the user drills into one
> exchange at a time.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)