James Netherton created CAMEL-17799:
---------------------------------------
Summary: camel-fhir: Integration tests are slow to execute
Key: CAMEL-17799
URL: https://issues.apache.org/jira/browse/CAMEL-17799
Project: Camel
Issue Type: Test
Reporter: James Netherton
Fix For: 3.17.0
The FHIR integration tests are quite slow and it's due to the test infra mock
HAPI server container being stopped / started on every integration test class.
We should be able to start the container once and reuse it for every itest (I
tried but did not figure out how to do it).
--
This message was sent by Atlassian Jira
(v8.20.1#820001)