Eric Shu created GEODE-6905:
-------------------------------

             Summary: Do not need to wait for initialization of distributed 
region before schedule region sync timed task
                 Key: GEODE-6905
                 URL: https://issues.apache.org/jira/browse/GEODE-6905
             Project: Geode
          Issue Type: Bug
          Components: regions
            Reporter: Eric Shu


The wait for initialization is only needed before the actual region sync 
operation. There is no need to wait for initialization just to schedule the 
region sync.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to