[ 
https://issues.apache.org/jira/browse/GEODE-6905?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Eric Shu reassigned GEODE-6905:
-------------------------------

    Assignee: Eric Shu

> Do not need to wait for initialization of distributed region before schedule 
> region sync timed task
> ---------------------------------------------------------------------------------------------------
>
>                 Key: GEODE-6905
>                 URL: https://issues.apache.org/jira/browse/GEODE-6905
>             Project: Geode
>          Issue Type: Bug
>          Components: regions
>            Reporter: Eric Shu
>            Assignee: Eric Shu
>            Priority: Major
>
> The wait for initialization is only needed before the actual region sync 
> operation. There is no need to wait for initialization just to schedule the 
> region sync.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to