[ 
https://issues.apache.org/jira/browse/HBASE-16562?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15595982#comment-15595982
 ] 

Mikhail Antonov commented on HBASE-16562:
-----------------------------------------

[~apurtell] the patch for this jira has been committed and never reverted, so 
jira isn't in sync with git at the moment. Shall we close this jira and open 
new one?

> ITBLL should fail to start if misconfigured
> -------------------------------------------
>
>                 Key: HBASE-16562
>                 URL: https://issues.apache.org/jira/browse/HBASE-16562
>             Project: HBase
>          Issue Type: Improvement
>          Components: integration tests
>            Reporter: Andrew Purtell
>            Assignee: Heng Chen
>             Fix For: 2.0.0, 1.0.4, 1.4.0, 1.3.1, 1.1.7, 0.98.23, 1.2.4
>
>         Attachments: HBASE-16562-branch-1.2.patch, 
> HBASE-16562-branch-1.2.v1.patch, HBASE-16562.patch, HBASE-16562.v1.patch, 
> HBASE-16562.v1.patch-addendum
>
>
> The number of nodes in ITBLL must a multiple of width*wrap (defaults to 25M, 
> but can be configured by adding two more args to the test invocation) or else 
> verification will fail. This can be very expensive in terms of time or hourly 
> billing for on demand test resources. Check the sanity of test parameters 
> before launching any MR jobs and fail fast if invariants aren't met with an 
> indication what parameter(s) need fixing. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to