[ https://issues.apache.org/jira/browse/HBASE-16562?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15595982#comment-15595982 ]
Mikhail Antonov commented on HBASE-16562: ----------------------------------------- [~apurtell] the patch for this jira has been committed and never reverted, so jira isn't in sync with git at the moment. Shall we close this jira and open new one? > ITBLL should fail to start if misconfigured > ------------------------------------------- > > Key: HBASE-16562 > URL: https://issues.apache.org/jira/browse/HBASE-16562 > Project: HBase > Issue Type: Improvement > Components: integration tests > Reporter: Andrew Purtell > Assignee: Heng Chen > Fix For: 2.0.0, 1.0.4, 1.4.0, 1.3.1, 1.1.7, 0.98.23, 1.2.4 > > Attachments: HBASE-16562-branch-1.2.patch, > HBASE-16562-branch-1.2.v1.patch, HBASE-16562.patch, HBASE-16562.v1.patch, > HBASE-16562.v1.patch-addendum > > > The number of nodes in ITBLL must a multiple of width*wrap (defaults to 25M, > but can be configured by adding two more args to the test invocation) or else > verification will fail. This can be very expensive in terms of time or hourly > billing for on demand test resources. Check the sanity of test parameters > before launching any MR jobs and fail fast if invariants aren't met with an > indication what parameter(s) need fixing. -- This message was sent by Atlassian JIRA (v6.3.4#6332)