[ 
https://issues.apache.org/jira/browse/HBASE-16562?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15602081#comment-15602081
 ] 

Andrew Purtell commented on HBASE-16562:
----------------------------------------

Then for sake of consistency could you revert everywhere [~busbey] ? 
/cc [~mantonov] 

> ITBLL should fail to start if misconfigured
> -------------------------------------------
>
>                 Key: HBASE-16562
>                 URL: https://issues.apache.org/jira/browse/HBASE-16562
>             Project: HBase
>          Issue Type: Improvement
>          Components: integration tests
>            Reporter: Andrew Purtell
>            Assignee: Heng Chen
>             Fix For: 2.0.0, 1.0.4, 1.4.0, 1.3.1, 1.1.7, 0.98.23, 1.2.5
>
>         Attachments: HBASE-16562-branch-1.2.patch, 
> HBASE-16562-branch-1.2.v1.patch, HBASE-16562.patch, HBASE-16562.v1.patch, 
> HBASE-16562.v1.patch-addendum
>
>
> The number of nodes in ITBLL must a multiple of width*wrap (defaults to 25M, 
> but can be configured by adding two more args to the test invocation) or else 
> verification will fail. This can be very expensive in terms of time or hourly 
> billing for on demand test resources. Check the sanity of test parameters 
> before launching any MR jobs and fail fast if invariants aren't met with an 
> indication what parameter(s) need fixing. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to