[ https://issues.apache.org/jira/browse/HBASE-19165?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16246888#comment-16246888 ]
Hudson commented on HBASE-19165: -------------------------------- FAILURE: Integrated in Jenkins build HBase-Trunk_matrix #4027 (See [https://builds.apache.org/job/HBase-Trunk_matrix/4027/]) HBASE-19165 TODO Handle stuck in transition: rit=OPENING, (stack: rev fd86de98e192d55f221f1891b712e927761736d9) * (edit) hbase-client/src/main/java/org/apache/hadoop/hbase/zookeeper/RecoverableZooKeeper.java * (edit) hbase-server/src/main/java/org/apache/hadoop/hbase/master/assignment/RegionStates.java * (edit) hbase-server/src/main/java/org/apache/hadoop/hbase/master/ServerManager.java * (edit) hbase-server/src/main/java/org/apache/hadoop/hbase/master/assignment/AssignmentManager.java * (edit) hbase-server/src/main/java/org/apache/hadoop/hbase/zookeeper/ZooKeeperMainServer.java * (edit) hbase-server/src/test/java/org/apache/hadoop/hbase/master/procedure/TestRestoreSnapshotProcedure.java * (edit) hbase-server/src/main/java/org/apache/hadoop/hbase/master/assignment/RegionStateStore.java * (edit) hbase-server/src/main/java/org/apache/hadoop/hbase/master/procedure/EnableTableProcedure.java > TODO Handle stuck in transition: rit=OPENING, location=ve0538.... > ----------------------------------------------------------------- > > Key: HBASE-19165 > URL: https://issues.apache.org/jira/browse/HBASE-19165 > Project: HBase > Issue Type: Bug > Components: migration > Reporter: stack > Assignee: stack > Priority: Critical > Fix For: 2.0.0-beta-1 > > Attachments: HBASE-19165.master.001.patch, > HBASE-19165.master.002.patch, HBASE-19165.master.003.patch, > HBASE-19165.master.003.patch > > > A few of us trying migration from hbase1 to hbase2 have run into various > assignment issues. In my case, I see that Master coming online, reading > hbase:meta, finding an issue in OPENING state and then just not assigning. My > thought is that its expecting a callback to come in. Eventually log is fills > with this sort of stuff: > 2017-11-02 15:02:54,237 WARN [ProcExecTimeout] assignment.AssignmentManager: > TODO Handle stuck in transition: rit=OPENING, > location=ve0528.halxg.cloudera.com,16020,1509657692581, > table=IntegrationTestBigLinkedList, region=919cc6636ffbed17f628f335d3a58726 > Let me get a cleaner run. This current log is polluted by a few restarts. -- This message was sent by Atlassian JIRA (v6.4.14#64029)