[ 
https://issues.apache.org/jira/browse/HBASE-19165?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16247064#comment-16247064
 ] 

Hudson commented on HBASE-19165:
--------------------------------

FAILURE: Integrated in Jenkins build HBase-2.0 #828 (See 
[https://builds.apache.org/job/HBase-2.0/828/])
HBASE-19165 TODO Handle stuck in transition: rit=OPENING, (stack: rev 
0aafbe7aa9a6b8f9d28e93681a71af5f20462807)
* (edit) 
hbase-server/src/test/java/org/apache/hadoop/hbase/master/procedure/TestRestoreSnapshotProcedure.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/master/assignment/AssignmentManager.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/master/procedure/EnableTableProcedure.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/master/ServerManager.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/master/assignment/RegionStates.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/zookeeper/ZooKeeperMainServer.java
* (edit) 
hbase-client/src/main/java/org/apache/hadoop/hbase/zookeeper/RecoverableZooKeeper.java
* (edit) 
hbase-server/src/main/java/org/apache/hadoop/hbase/master/assignment/RegionStateStore.java


> TODO Handle stuck in transition: rit=OPENING, location=ve0538....
> -----------------------------------------------------------------
>
>                 Key: HBASE-19165
>                 URL: https://issues.apache.org/jira/browse/HBASE-19165
>             Project: HBase
>          Issue Type: Bug
>          Components: migration
>            Reporter: stack
>            Assignee: stack
>            Priority: Critical
>             Fix For: 2.0.0-beta-1
>
>         Attachments: HBASE-19165.master.001.patch, 
> HBASE-19165.master.002.patch, HBASE-19165.master.003.patch, 
> HBASE-19165.master.003.patch
>
>
> A few of us trying migration from hbase1 to hbase2 have run into various 
> assignment issues. In my case, I see that Master coming online, reading 
> hbase:meta, finding an issue in OPENING state and then just not assigning. My 
> thought is that its expecting a callback to come in. Eventually log is fills 
> with this sort of stuff:
> 2017-11-02 15:02:54,237 WARN  [ProcExecTimeout] assignment.AssignmentManager: 
> TODO Handle stuck in transition: rit=OPENING, 
> location=ve0528.halxg.cloudera.com,16020,1509657692581, 
> table=IntegrationTestBigLinkedList, region=919cc6636ffbed17f628f335d3a58726
> Let me get a cleaner run. This current log is polluted by a few restarts.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to