[ 
https://issues.apache.org/jira/browse/IGNITE-7786?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Dmitry Sherstobitov updated IGNITE-7786:
----------------------------------------
    Summary: Changing baseline topology on cluster may have error in control.sh 
utility  (was: Changing baseline topology on big cluster may have error in 
control.sh utility)

> Changing baseline topology on cluster may have error in control.sh utility
> --------------------------------------------------------------------------
>
>                 Key: IGNITE-7786
>                 URL: https://issues.apache.org/jira/browse/IGNITE-7786
>             Project: Ignite
>          Issue Type: Bug
>    Affects Versions: 2.3
>            Reporter: Dmitry Sherstobitov
>            Priority: Major
>
> Looks like there is hardcoded timeout for waiting result of change baseline 
> operation
> In big cluster there is following behaviour: (154 nodes)
>  # Set new baseline topology version
>  # Utility connects, but then fails by connection error
>  # Cluster successfully activated



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to