Noel J. Bergman wrote:
Stephen,Yep - I noticed that (basically the same issues I've been dealing with this last week and the reson why I've been working up the product table this week):
Who is wondering what he should do with the James tranformation ofWe'd love to have it, Stephen. The only issue appears to be whether or not
CM to SM that he has on his machine?
we want it before Avalon is ready to do a Release. Related to this, Dion
Gillard is working on the Maven setup for James. He also needs us to have a
clean set of Avalon JAR files. Right now he's having trouble because of
James / Avalon compatibility issues.
http://www.osm.net/technical/avalon/docs/avalon.html
The are a coule of steps:Serge's view, and I think there is justification, is that we want a Release, not another CVS dump. I do see that Avalon (in the person of you, for the most part) is starting to do the preliminary work necessary. Personally, since James v3 is in early development, I don't know that I would mind starting with a tagged CVS release that was considered by the Avalon PMC to be a Milestone build, but mine is just one vote.
(a) getting out a release candidate (milestone build) of Cornerstone - this need Avalon an OK
(b) getting a release together - this needs PMC which needs process which needs time
I want to get the changes off my machine and into James and from there start validation of operation within Phonix. If there is a problem with Phoenix execution based on the Cornerstone CVS release - we jump in and fix Phoenix. Once everything is working nicely - we move forward with a release. But release has prerequisites - and there is as little housekeeping that needs to be done over on avalon first. I would like to can to the point of validating a candate before we get into the release process - and that means getting this stuff into James HEAD.
Sounds reasonable - I will make a proposal on Avalon for RELEASE CANDIDATE (milestonte) status of the Cornerstone jars. If that flows through - I'll make a proposal to James to ramp up to the RC jars. Assuming that that flows though - we put in place validate of deployment of James on Merlin and Phoenix - we solve any problems that arrise. After that - you guys give the green light for a release to Avalon - following which I'll persue a process of release (taking into account all of the the dependency considerations).My suggestion is that you propose to us that you submit your patches concurrent with such a Milestone from Avalon, and let us vote on it. This is important for Maven, too, since they would put your version labeled jars into their central repository.
I'm feeling a little uncomfortable about all of this - I don't have a good idea about what is wrong - I don't know if James is the only user of this or not - and I don't like the fact that I don't know where we are!!!On a related topic, I've no problem with Avalon keeping store. I was just pointing out that Peter Donald has commented that he thought it ought to be moved to James. Right now we do have our own (fixed) copy of the file store implementation, since it was broken, and we were told to fix it in copies of our own so that it could be removed from Avalon.
But I do want to resolve this.
In the meantime:
Step 1: Avalon OK on a RC status on the Cornerstone build.
Step 2: James OK on migration to RC and CM --> SM migratiton.
I'll get started on step (1).
Cheers, Steve.
--- Noel
--
To unsubscribe, e-mail: <mailto:[EMAIL PROTECTED]>
For additional commands, e-mail: <mailto:[EMAIL PROTECTED]>
-- Stephen J. McConnell mailto:[EMAIL PROTECTED] http://www.osm.net -- To unsubscribe, e-mail: <mailto:[EMAIL PROTECTED]> For additional commands, e-mail: <mailto:[EMAIL PROTECTED]>