On Friday 18 July 2003 14:29, Eric Jain wrote: Hi,
> I ran into the same problem recently. While scheduling within 24 h > cycles seems to be possible, more complex constraints such as 'every > Friday evening' don't seem to be possible. I only need the every 24hr at the moment. > There is an open source tool > called Quartz [http://www.part.net/quartz.html] that even provides an > MBean for flexible scheduling, Looks interesting. Thanks Phil -- 9:47pm up 93 days, 10:40, 1 user, load average: 0.14, 0.10, 0.04 ICQ: 760757 AIM: pjshrimpton Y!: pjshrimpton ------------------------------------------------------- This SF.net email is sponsored by: VM Ware With VMware you can run multiple operating systems on a single machine. WITHOUT REBOOTING! Mix Linux / Windows / Novell virtual machines at the same time. Free trial click here: http://www.vmware.com/wl/offer/345/0 _______________________________________________ JBoss-user mailing list [EMAIL PROTECTED] https://lists.sourceforge.net/lists/listinfo/jboss-user