On Friday 18 July 2003 14:29, Eric Jain wrote:

Hi,

> I ran into the same problem recently. While scheduling within 24 h
> cycles seems to be possible, more complex constraints such as 'every
> Friday evening' don't seem to be possible. 

I only need the every 24hr at the moment.

> There is an open source tool
> called Quartz [http://www.part.net/quartz.html] that even provides an
> MBean for flexible scheduling,

Looks interesting. Thanks

Phil
-- 
  9:47pm  up 93 days, 10:40,  1 user,  load average: 0.14, 0.10, 0.04
           ICQ: 760757       AIM: pjshrimpton       Y!: pjshrimpton


-------------------------------------------------------
This SF.net email is sponsored by: VM Ware
With VMware you can run multiple operating systems on a single machine.
WITHOUT REBOOTING! Mix Linux / Windows / Novell virtual machines at the
same time. Free trial click here: http://www.vmware.com/wl/offer/345/0
_______________________________________________
JBoss-user mailing list
[EMAIL PROTECTED]
https://lists.sourceforge.net/lists/listinfo/jboss-user

Reply via email to