Nick
I made temporary bulkheads from 1/2" ply with a cleat fastening them to my 
work table. My sides are vertical (no banana boat shape). The temp bulkheads 
are at important points (firewall, forward spar, aft spar, and several 
places along the tail cone. They could also be trapezoidal if you want to 
build your fuselage with the banana boat shape. With each side, I fastened 
the bulkheads in place and immediately upon gluing and stapling on the skin, 
I clamped the side to the bulkheads and let them cure in that curved shape. 
I had no trouble or breakage doing it this way. I see that you already have 
your skins glued on in a flat configuration. You should still be able to 
bend them to get a wider fuselage. I would suggest that you slowly pull them 
to the desired shape. This is how most builders have constructrd their 
fuselages. I remember a builder from the northeast (Vermont or New 
Hampshire) that I met at Brian Kraut campsite at Sun-n-Fun 2006 who dampened 
his side trusses because he heard cracking noises when he started to bend 
his fuselage. I guess the added moisture made them a little more flexible.
I found that using the bulkheads held everything rigid and inline till all 
the lower crossmembers and bottom skin are fit and glued fast. Hope this 
helps.

Pete Klapp, KR-2S builder,
Canton, Ohio

From: "Nick Brennan" <nickdbren...@comcast.net>
Reply-To: KRnet <kr...@mylist.net>
To: "KRnet" <kr...@mylist.net>
Subject: KR> Joining the sides
List-Post: krnet@list.krnet.org
Date: Wed, 11 Apr 2007 19:50:13 -0700

Hey gang,

I'm having some difficulty joining the sides of the fuselage together.  I 
originally wanted to go a few inches wider, but could barely get the fuse to 
bend to begin with, so I'm back to plan width (sucks, but it'll have to do).

_______________________________________
Search the KRnet Archives at http://www.maddyhome.com/krsrch/index.jsp
to UNsubscribe from KRnet, send a message to krnet-le...@mylist.net
Post photos, introductions, and For Sale items to 
http://www.kr2forum.com/phpBB2/index.php
please see other KRnet info at http://www.krnet.org/info.html

_________________________________________________________________
Mortgage refinance is Hot. *Terms. Get a 5.375%* fix rate. Check savings 
https://www2.nextag.com/goto.jsp?product=100000035&url=%2fst.jsp&tm=y&search=mortgage_text_links_88_h2bbb&disc=y&vers=925&s=4056&p=5117


Reply via email to