From: Daniel Bristot de Oliveiva <bris...@redhat.com>

Currently, the sched:sched_switch tracepoint reports deadline tasks
with priority -1. But when reading the trace via perf script I've
got the following output:

  # ./d & # (d is a deadline task, see [1])
  # perf record -e sched:sched_switch -a sleep 1
  # perf script
      ...
         swapper     0 [000]  2146.962441: sched:sched_switch: swapper/0:0 
[120] R ==> d:2593 [4294967295]
               d  2593 [000]  2146.972472: sched:sched_switch: d:2593 
[4294967295] R ==> g:2590 [4294967295]

The task d reports the wrong priority [4294967295]. This happens because
the "int prio" is stored in an unsigned long long val. Although it is
set as a %lld, as int is shorter than unsigned long long,
trace_seq_printf prints it as a positive number.

The fix is just to cast the val as an int, and print it as a %d,
as in the sched:sched_switch tracepoint's "format".

The output with the fix is:

  # ./d &
  # perf record -e sched:sched_switch -a sleep 1
  # perf script
      ...
         swapper     0 [000]  4306.374037: sched:sched_switch: swapper/0:0 
[120] R ==> d:10941 [-1]
               d 10941 [000]  4306.383823: sched:sched_switch: d:10941 [-1] R 
==> swapper/0:0 [120]

[1] gcc -o d d.c - from http://bristot.me/lkml/d.c

Signed-off-by: Daniel Bristot de Oliveira <bris...@redhat.com>
Cc: Steven Rostedt <rost...@goodmis.org>
Cc: Ingo Molnar <mi...@redhat.com>
Cc: Peter Zijlstra <pet...@infradead.org>
Cc: Arnaldo Carvalho de Melo <a...@kernel.org>
Cc: Alexander Shishkin <alexander.shish...@linux.intel.com>
Cc: Jiri Olsa <jo...@redhat.com>
Cc: linux-kernel@vger.kernel.org

diff --git a/tools/lib/traceevent/plugin_sched_switch.c 
b/tools/lib/traceevent/plugin_sched_switch.c
index f1ce600..ec30c2f 100644
--- a/tools/lib/traceevent/plugin_sched_switch.c
+++ b/tools/lib/traceevent/plugin_sched_switch.c
@@ -111,7 +111,7 @@ static int sched_switch_handler(struct trace_seq *s,
        trace_seq_printf(s, "%lld ", val);
 
        if (pevent_get_field_val(s, event, "prev_prio", record, &val, 0) == 0)
-               trace_seq_printf(s, "[%lld] ", val);
+               trace_seq_printf(s, "[%d] ", (int) val);
 
        if (pevent_get_field_val(s,  event, "prev_state", record, &val, 0) == 0)
                write_state(s, val);
@@ -129,7 +129,7 @@ static int sched_switch_handler(struct trace_seq *s,
        trace_seq_printf(s, "%lld", val);
 
        if (pevent_get_field_val(s, event, "next_prio", record, &val, 0) == 0)
-               trace_seq_printf(s, " [%lld]", val);
+               trace_seq_printf(s, " [%d]", (int) val);
 
        return 0;
 }
-- 
2.9.3

Reply via email to