Dear Carsten and others

I've read the new draft and offer some suggestions, mostly editorial, but there are a couple of other constraints that I think might merit mentioning (particularly regularory), and a couple of questions I have embedded in the text. The edited version is here:

https://dl.dropbox.com/u/472780/draft-ietf-lwig-terminology-02_CGP.txt

and the changes may be found with diff.

Hope this may be of some use.

Regards - Charles

On 28/03/2013 16:47, Carsten Bormann wrote:
As we discussed in Orlando, a small design team charged ahead and wrote down 
some power terminology, creating a new section 4 in the terminology draft.  
Thanks Ari, Dominique, Peter.
And thanks Jari for letting us borrow some text out of lwig-cellular.

Please have a look:

A diff from the previous version is available at:
http://www.ietf.org/rfcdiff?url2=draft-ietf-lwig-terminology-02
In Orlando, we said we wanted to time-box this into March, so:

-- Is this the section that we wanted?
-- Does this need major surgery, or can we do a couple small fixes and then go 
for WGLC?

Grüße, Carsten

_______________________________________________
Lwip mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/lwip



--
Regards - Charles Palmer
Project Hydra Project Manager - Acute Technology Limited
Woodthorpe, Calver Road, Baslow, Derbyshire, DE45 1RR, United Kingdom
Mob: +44 (0)7977 577 627    Skype: Acutetech
Email: [email protected] Web: http://projecthydra.info

_______________________________________________
Lwip mailing list
[email protected]
https://www.ietf.org/mailman/listinfo/lwip

Reply via email to