>From my neck of the woods -- there is a test called LoadTest that is
certainly long-running by design. The rest ought to be quick. Is there
a clean way to separate these in Maven? I support separating those
out, as well as the Hadoop ones.



On Fri, Sep 18, 2009 at 10:39 AM, Isabel Drost <[email protected]> wrote:
>
> Hello,
>
> is it just my current machine, or do we have some pretty slow
> running/large tests in our unit test suite?
>
> What do you think about splitting the tests into short (sort of
> pre-commit) and longish (sort of integration) tests during
> build-time? That should be relatively easy to set up with maven.
>
> Are there tests that could benefit from a little optimization to run
> faster?
>
> Isabel
>
>

Reply via email to