Yeah, don't know how to do it in Ant. There are decorator implementations of
TestSuite that can parallelize, thought it means maintaining the suites sort
of manually in code. Indeed it is one line in Ant.

In the end you have to run all tests before a release. There is a useful
distinction between stuff that tests whether a unit is correct and stuff
that tests whether units work together, or under load, or with external
entities. One should test units all the time and maybe integration tests
less so. And happily it is usually quick to run unit tests. So, common to
run at every checkin and practical too.

I suppose the question is do we really have integration tests, or just some
fat unit tests? My LoadTest falls I think in my mental category of
integration test I think. I can picture Hadoop blackbox tests being the same
(theory being perhaps there are also unit tests for the mapper in isolation
- we don't have these though)

Or we take a moment to figure out parallelization and speed up a few key
tests. The time doesn't bother me much yet. Takes maybe 5 mins? When that is
30, I will complain!

Sean

On Sep 18, 2009 3:29 PM, "Grant Ingersoll" <[email protected]> wrote:

Is it possible to setup the tests to run in parallel?  I know Ant has this
option.  This could speed things up.

As for integration vs units.  Are you suggesting then, that most of the time
you'd only run the unit tests?  In the end, the only way you have assurance
that things are still working is that all the tests pass.  In other words, I
don't quite understand the benefit of moving things around.

FWIW, I usually just run the individual test in my IDE and then before
committing run all the tests.

On Sep 18, 2009, at 4:04 AM, Isabel Drost wrote: > On Fri, 18 Sep 2009
11:36:40 +0100 > Sean Owen...

Reply via email to