Hi all, I am using hadoop 0.20.2. I am setting the property mapred.tasktracker.map.tasks.maximum = 4 (same for reduce also) on my job conf but I am still seeing max of only 2 map and reduce tasks on each node. I know my machine can run 4 maps and 4 reduce tasks in parallel. Is this a bug in 0.20.2 or am I doing something wrong?
Configuration conf = new Configuration(); conf.set("mapred.tasktracker.map.tasks.maximum", "4"); conf.set("mapred.tasktracker.reduce.tasks.maximum", "4"); Thanks Praveen