thanks Sir, w're very interested with this answer

    Le jeudi 18 novembre 2021, 17:14:12 UTC+1, Ray Daniel Zimmerman 
<r...@cornell.edu> a écrit :  
 
 First, if you are using runopf_w_res(), you are solving a deterministic 
problem … i.e. you must specify a capacity (PMAX) for your RES units that 
is/will be available with certainty. If this is not what you want, maybe you 
want to look into the stochastic approach taken by MOST, which is by nature 
much more complicated, unfortunately.
To your first question, the max reserves for RES are whatever you decide. They 
are inputs to the problem. In any case, the dispatch plus reserves provided by 
any unit, CG or RES, will be less than the PMAX, which is where you specify the 
available capacity for RES.
On the second question, it is co-optimizing energy and reserves (not 
dispatching energy first), so the optimal solution will depend on both energy 
and reserve costs and their interactions with the reserve requirements you’ve 
specified. It sounds to me like, either your reserve requirements do not 
include alternative ways to provide those reserves, or those alternatives are 
more expensive
Hope this helps,
   Ray




On Nov 18, 2021, at 1:25 AM, sebaa haddi <sebaa...@yahoo.fr> wrote:
Dear Dir , you query is a good topic also , the reserve should be intermittent 
within the the specified limits in case of RES, the stochastic optimization can 
give only the optimal amount either in high amount or in less amount depending 
on the introduced data of RES sources...

Le jeudi 18 novembre 2021, 07:25:41 UTC+1, ritu jain <ritujain.n...@gmail.com> 
a écrit :

Hello all,I am working on joint energy and reserve market optimization for 24 
hours on IEEE 30 bus system. . In my case I am using both conventional 
generators(CGs) and RES generation(wind and solar). For CGs, i have fixed the 
maximum reserves (max reserve=capacity available-dispatched during peak load) 
but I am doubt what will be the maximum reserve in case of RES. While 
performing opf using "runopf_w_res" i am not getting satisfactory results.  I 
am having following queries:1. what will be the maximum reserve in case of RES 
as they are variable.2. In case1, I have taken that RES will participate in 
Energy market (EM)only in that case, I am getting that maximum RES is 
dispatched in EM (due to low cost). Whereas, in case 2 when RES is 
participating in both energy and reserve market (RM)( I am taking maximum 
reserve of RES as their installed capacity) , the energy dispatched in energy 
market is different than in case1 i.e. limited RES energy is dispatched in EM 
and most of it is dispatched in RM. What is the reason, as the energy market is 
dispatched first then maximum power of RES should be dispatched in that and the 
remaining power of RES  should be dispatched in RM. Please give your valuable 
suggestions regarding the same.Thanks in advance.


  