thanks Sir, w're very interested with this answer Le jeudi 18 novembre 2021, 17:14:12 UTC+1, Ray Daniel Zimmerman <r...@cornell.edu> a écrit : First, if you are using runopf_w_res(), you are solving a deterministic problem … i.e. you must specify a capacity (PMAX) for your RES units that is/will be available with certainty. If this is not what you want, maybe you want to look into the stochastic approach taken by MOST, which is by nature much more complicated, unfortunately. To your first question, the max reserves for RES are whatever you decide. They are inputs to the problem. In any case, the dispatch plus reserves provided by any unit, CG or RES, will be less than the PMAX, which is where you specify the available capacity for RES. On the second question, it is co-optimizing energy and reserves (not dispatching energy first), so the optimal solution will depend on both energy and reserve costs and their interactions with the reserve requirements you’ve specified. It sounds to me like, either your reserve requirements do not include alternative ways to provide those reserves, or those alternatives are more expensive Hope this helps, Ray
On Nov 18, 2021, at 1:25 AM, sebaa haddi <sebaa...@yahoo.fr> wrote: Dear Dir , you query is a good topic also , the reserve should be intermittent within the the specified limits in case of RES, the stochastic optimization can give only the optimal amount either in high amount or in less amount depending on the introduced data of RES sources... Le jeudi 18 novembre 2021, 07:25:41 UTC+1, ritu jain <ritujain.n...@gmail.com> a écrit : Hello all,I am working on joint energy and reserve market optimization for 24 hours on IEEE 30 bus system. . In my case I am using both conventional generators(CGs) and RES generation(wind and solar). For CGs, i have fixed the maximum reserves (max reserve=capacity available-dispatched during peak load) but I am doubt what will be the maximum reserve in case of RES. While performing opf using "runopf_w_res" i am not getting satisfactory results. I am having following queries:1. what will be the maximum reserve in case of RES as they are variable.2. In case1, I have taken that RES will participate in Energy market (EM)only in that case, I am getting that maximum RES is dispatched in EM (due to low cost). Whereas, in case 2 when RES is participating in both energy and reserve market (RM)( I am taking maximum reserve of RES as their installed capacity) , the energy dispatched in energy market is different than in case1 i.e. limited RES energy is dispatched in EM and most of it is dispatched in RM. What is the reason, as the energy market is dispatched first then maximum power of RES should be dispatched in that and the remaining power of RES should be dispatched in RM. Please give your valuable suggestions regarding the same.Thanks in advance.