NOTICE INVITING PROPOSALS
The Governor, Himachal Pradesh (INDIA)invites
proposals from
Eligible Bidders for the implementation of the
following Hydro-electric Projects in the Private
Sector on Build, Own, Operate and Transfer (BOOT)
basis:-
CATEGORY I
1. Harsar Chamba Budhil/Ravi 60 MW
2. Bharmour Chamba Budhil/Ravi 45 MW
3. Suil Chamba Suil/Ravi 13 MW
4. Kut Kinnaur Kut/Satluj 24 MW
5. Tidong-II Kinnaur Tidong/Satluj 60 MW
6. Khoksar Lahaul & Spiti Chandra/Chenab 90 MW
7. Gharopa Kullu Beas 99 MW
8. Shalvi Shimla Shalvi/Yamuna 7 MW
9. Fozal Kullu Fozal/Beas 9 MW
10. Sal-I Chamba Sal/Ravi 6.5 MW
11. Kilhi Bahl Kangra Binwa/Beas 7.5 MW
CATEGORY II
1. Jangi Thopan Kinnaur Satluj 480 MW
2. Thopan Powari Kinnaur Satluj 480 MW
3. Kutehar Chamba Ravi 260 MW
4. Chamba Chamba Ravi 126 MW
Note :
1 The Harsar Hydro-electric Project area falls in
Kugti Wild Life Sanctuary. The Developer shall have to
seek clearance of WL Board & Empowered Committee of
the Supreme Court at his level.
2. In respect of Fozal Hydro-electric Project, there
is an arbitration case filed by M/s Cosmos Consulting
in the Honble High Court of H.P. The Arbitration
Tribunal constituted by the Honble High Court has
restrained the State Govt. for allocating the Project
to a third party and also from implementing itself
till the disposal of the case. Therefore, the Project
shall be allotted only after obtaining permission of
the Arbitration Tribunal.
The Eligible Bidder shall mean a Company or a
Consortium of Companies or a Corporation, whether in
the public or private sector and whether of Indian or
foreign origin.
GENERAL CONDITIONS
A. Applicable for all Projects:
The Bidders should have strong financial and technical
base with adequate free investible reserves and
surpluses and requisite technical capability necessary
for the development of the above Hydro-electric
Projects.
The operation period of the Projects shall be forty
(40) years from the Commercial Operation Date (COD) of
the Projects at the end of which these shall stand
transferred to the Government of Himachal Pradesh free
of cost.
The Developers will be free to dispose of power from
the Projects, after allowing for royalty in the shape
of free power to the State, in any manner they like in
accordance with the provisions contained in the
Electricity Act, 2003 and the rules and regulations
made thereunder.
The Project Developer will be required to provide
royalty in the shape of free power from the Project to
the Government of Himachal Pradesh in lieu of
surrender of potential site @ 12% of the Deliverable
Energy of the Project for the period starting from the
date of synchronization of the first generating unit
and extending upto 12 years from the Date of
Commercial Operation of the Project, @ 18% of
Deliverable Energy of the Project for a period of next
18 years and thereafter @ 30% of the Deliverable
Energy for the balance agreement period beyond 30
years. The royalty in the shape of free power shall
start accruing to the Govt. from the Scheduled
Commercial Operation Date. In case the actual COD is
delayed beyond the Scheduled COD, in that event the
amount of free power component as royalty shall accrue
to Govt. of H.P. because of extended COD and the
Developer shall pay the same in 10 equal installments
from the actual COD.
The Developer shall reimburse to the Board the amount,
spent by the Board on investigations and
infrastructure works of the Project upto the date of
signing of Implementation Agreement, with compound
interest @ 10% per annum within three months of
signing the Implementation Agreement.
The scope of the work will be from concept to
commissioning and operation thereafter, including,
inter-alia, survey and investigations, identification
of transmission system for the evacuation of power and
preparation/review of Detailed Project Report (DPR).
The transmission system for evacuation of power shall
form part of the Project and shall be included in the
DPR in consultation with HPSEB keeping in view the
integrated system requirements.
The Project Developer will be required to make
arrangements for evacuation of power from the Project
to the Boards/PGCILs Sub Station (designated as the
Interconnection Point) as per the provision in the
DPR. For evacuation of power beyond the
Interconnection Point, the Developer shall tie up with
HPSEB/PGCIL for arrangements of a suitable integrated
transmission system at mutually agreed wheeling
charges.
Interested parties can submit Bids for one or more
Projects. One Bid Document purchased will hold good
for submission of Bid for only one Project. The Bids
as well as the Processing Fee shall be submitted
separately for each Project applied for.
. The Developer will be permitted to withdraw
from the Project after the submission of the DPR if
the Government is satisfied that the Developer has
sufficient ground to establish tha the Project is not
techno-economically viable.
A. Applicable for Category-I Projects:
1. A letter of allotment shall be issued to the
successful/selected Bidders asking them to execute a
Memorandum of Understanding (MOU) with the Government
of Himachal Pradesh for which a sum of Indian Rupees
equivalent to Rupees one lac (Rs. 1,00,000) per Mega
Watt of installed capacity subject to a maximum amount
of Rupees Fifty lacs (Rs.50,00,000) only shall
required to be deposited by the successful Bidder as
the Security Deposit either through Bankers Cheque or
the Bank Draft drawn in favour of Govt. of HP on a
scheduled Indian Bank. As per the terms & conditions
of MOU the Developer shall be required to achieve
various milestones. The Developer shall submit a
Detailed Project Report (DPR) commensurate with the
allotted site within a period of 18 months in Projects
upto 50 MW and 24 months in other Projects from the
date of signing of MOU, to Govt. of H.P. for appraisal
by State Govt./Central Electricity Authority as the
case may be. Subject to the Govt. as well as the
Developer having satisfied themselves about the
techno-economic feasibility of the Project, the
Developer shall execute the Implementation Agreement
(IA) with the Govt. within a period of 30 months from
the date of signing of MOU where DPR prepared by HPSEB
is available and within 36 months from the date of
signing of MOU in cases where DPR is to be prepared
afresh. The Developer will have to deposit a Security
Deposit of either a sum of Rs. four lacs (Rs.
4,00,000) per MW in case the Deposit is made in the
form of Bank Guarantee or a sum equivalent to Rs. two
lacs (Rs. 2,00,000) per MW in case Deposit is to be
made as cash/Bank Draft.
2. Successful/Selected bidders shall be required
to deposit upfront premium @ Rupees Ten Lacs (Rs.
10,00,000) only per MW. The upfront premium shall be
payable by the successful Bidders in three
installments i.e. 50% amount at the time of signing of
MOU, 25% at the time of signing of Implementation
Agreement and remaining 25% immediately after
financial closure.
B. Applicable for Category-II
Projects:
1. The selection process will be in two stages. In
the first stage the interested companies shall submit
Pre-qualification Bids as per the Request for
Qualification (RFQ) document. In the second stage, the
Pre-qualified Bidders will be invited to submit Price
Bids. In the Price Bids, the Bidders would be required
to quote the upfront charges over and above a minimum
amount of Rupees Ten lacs (Rs.10,00,000) per Mega Watt
capacity of the Project. The quoted upfront premium
shall be payable in three installments i.e. 50% amount
immediately after allotment of Project, 25% at the
time of signing of Implementation Agreement and
remaining 25% immediately after financial closure.
2. A letter of allotment shall be issued to the
successful Bidders asking them to prepare/update the
DPR of the allotted Project and for achieving various
benchmarks and submission of final DPR. The Govt. of
H.P. shall sign the Implementation Agreement (I.A.)
with the successful Bidder within a period of 30
months from the date of allotment of the Project
where DPR prepared by HPSEB is available and in 36
months from the date of allotment in cases
where the DPR is to be prepared afresh. The
Developer shall submit a Detailed Project Report
(DPR) commensurate with the allotted site within a
period of 24 months from the date of allotment, to
GoHP for appraisal by State Govt./Central
Electricity Authority as the case may be. Subject
to the Govt. as well as the Developer having satisfied
themselves about the techno-economic feasibility of
the Project, the Developer shall execute the I.A. with
the Govt. within a period 30 months from the date of
allotment where the DPR prepared by HPSEB is available
and 36 months where DPR is to be prepared by the
Developer. The Developer will have to deposit a
Security Deposit of either a sum of Rupees four lacs
(Rs.4,00,000) per MW in case the Deposit is made in
the form of Bank Guarantee or a sum equivalent to
Rupees two lacs (Rs.2,00,000) per MW in case Deposit
is to be made as cash/Bank Draft.
D. Other Instructions:
1. The brochure containing details of terms and
conditions regarding Bidding and Project
Implementation, Bid Application Formats, questionnaire
etc. would be available to the interested Bidders
w.e.f. 7th November, 2005 on payment of Rupees two
lac (Rs. 2,00,000) only per Project through a bank
draft/bankers cheque, from the office of the Chief
Engineer (PSP), HPSEB, Vidyut Bhawan, Shimla-171004
(HP) India, Tel. 91-177-2803253,
Fax-91-177-2803253/91-177-2658984 e-mail:
[EMAIL PROTECTED] Documents will be sent through
Registered Post/Speed Post. The bank draft/bankers
cheque shall be given in the name of Accounts Officer
(Banking), HPSEB, Shimla and drawn on any scheduled
Indian Bank at Shimla. For getting the documents
through Courier service additional charges @ Rs.1000/-
for inland and Rs.5000/- for foreign countries shall
be payable. The Bids will be accepted only from the
Bidders who purchase the Bid Documents. The last date
for the supply of Bid Documents to the interested
Bidders shall be 21st January, 2006 (1700 Hrs. IST).
2. The last date for submission of bids in the
Office of Chief Engineer (PSP) at the above address,
is 22nd January, 2006 upto 1300 hrs. The Bids will be
opened on the same day i.e. 22nd January, 2006 at 1600
hrs. in his office.
3. The Bidders shall also be required to
furnish a non-refundable Processing Fee @
Rupees One lac (Rs. 1,00,000) only per MW subject to
maximum of Rupees Ten lacs (Rs.10,00,000/-) per
Project applied for. The payment shall be made through
bank draft/bankers cheque in the name of Accounts
Officer (Banking), HPSEB, Shimla drawn on any
scheduled Indian Bank at Shimla. Bids not accompanied
by the Processing Fee are liable to be rejected
forthwith.
4. The Detailed Project Reports in respect of
Kutehr, Suil, Sal-I and Bharmour Hydroelectric
Projects have been prepared by HPSEB. The Independent
Power Producers (IPPs) interested in these Projects
would be required to review the DPR available with
HPSEB. The IPPs will be required to obtain the copy of
the DPR from the office of Chief Engineer (PSP),
HPSEB, at an additional payment of Rs. 50,000/-
(Rupees fifty thousand) per copy per Project, through
a Bank Draft/Bankers Cheque.
PROJECT PROFILES
GENERAL
Himachal Pradesh, spread over an area of 55673 Sq.
Kms., is located in the Northern part of India. It is
situated South of Jammu and Kashmir and North-East of
the Punjab State. It is located at altitudes ranging
between 450 m and 6500 m above mean sea level. There
is a general increase in elevation from West to East
and from South to North. There are five major river
basins in the State contributing both to the Indus and
Ganges basin e.g. the Chenab, the Ravi, the Beas, the
Satluj and the Yamuna. The State is endowed with more
than 20000 MW of hydro potential out of which only
about 6062 MW of potential has so far been exploited.
I. Detail of Projects to be
implemented through MOU route.
1. Harsar HEP (60 MW):-
Harsar Hydro-electric Project has been contemplated as
a run-of-the river scheme utilizing the water of
Budhil Nallah, a tributary of river Ravi located near
village Harsar in Distt. Chamba of Himachal Pradesh.
The Project comprises a + 30m high Dam on Budhil
Nallah with FRL at E1+ 2220m and bed level + 2200m, a
Trench Weir on Chobia Nallah, a + 5.5 Km. long main
Tunnel to divert water of Budhil Nallah and + 0.9 Km.
long small Tunnel to divert water of Chabia Nallah
into the main Tunnel to carry a design discharge of +
18 cumecs, a Power House to house three units of 20 MW
each with total installed capacity of 60 MW to
generate + 306 Million units of energy annually by
utilizing a net head of + 400m.
2. Bharmour HEP (45 MW):-
Bharmour Hydro-electric Project has been
envisaged on Budhil Nallah, a tributary of river Ravi
in Distt. Chamba of Himachal Pradesh. The Project
comprises a radial Gated Barrage about 200m down
stream the confluence of Chobia Nallah with Budhil
Nallah near village Harsar, 2 No. underground central
silt gutter type Desilting Tanks, a horse-shoe shaped
3.25m dia Head Race Tunnel to carry a design discharge
of 27.40 cumecs, an under ground 8m dia Surge Shaft
with top elevation 1862.50m and bottom level at
1796.50m, an underground Pressure Shaft, an under
ground Power House 45.75 x 13.70 x 33.62m proposed at
1 Km upstream of Thalla bridge on right Bank of Budhil
Nallah opposite of Bharmour town. The Power House has
2 No. vertical axis Francis turbines of 45 MW (2 x
22.5 MW) capacity to generate 199.29 MU of energy
annually utilizing a net head of 186m.
PROJECT PROFILES
3. Suil HEP (13 MW):
The Suil Hydro-electric Project has been
conceived as a run of-the river type development. The
Project comprises a 30 m long Trench Weir, a Desilting
Arrangement consisting of two parallel troughs, each
39.50m long, 9.80m wide and 3.50m high to exclude silt
particles down to 0.30mm size, a 3.175 Km long 2.5m
dia D-shaped tunnel and + 1.91 Km long Power Channel
of size 3.00m x 2.60m rectangular RCC box type,
designed to carry discharge of 13.20 cumecs, a Forebay
+ 1078 m long 3m wide and depth varying between 2.85m
to 4.16m, 166.00m long Penstock of 2.0m dia
bifurcating into two branches of 1.45m dia each to
feed two No. Horizontal axis Francis generating units
of 6.5 MW each in a surface Power House on the left
bank of Suil Nallah under average net head of 111.50m,
to generate the power. After generation, water is
discharged through 14.32m wide, 20m long Tail Race
Channel back to Suil Nallah. The Project will be able
to generate 68.96 Gwh and 70.67 Gwh of energy at bus
bars in 90% dependable year and 50% mean year
respectively.
4. Kut HEP (24 MW):
Kut Hydro-electric Project has been
contemplated as run-of-the river scheme utilizing the
water of Kut Khad, a tributary of river Satluj in
Distt. Kinnaur (HP). The Project comprises a 20 m long
and 2m wide drop type Trench Weir at El + 2080 m about
5 Km upstream of confluence of Kut Khad with Satluj
river, a Vortex type Desilting Tank of dia 5 m to
exclude all particles above 0.25 mm size, a 3.5 Km
long D-shaped concrete lined Head Race Tunnel of dia
2.10 m to carry a design discharge of 4.4 cumecs, a
150 m x 4 m D-shaped underground Forebay with storage
capacity of 1200 cum, a 1.60 m dia surface Penstock, a
underground Power House 36mx16m on the Right Bank of
Satluj river at El + 1400 m to house 2 No. vertical
axis Pelton Turbines of total installed capacity as 24
MW (2 x 12 MW) to generate 120.44 MU of energy
annually utilizing a net head of + 650 m.
5. Tidong-II HEP (60 MW):-
Tidong-II Hydro-electric Project is a
run-of-the river development on Tidong Khad a
tributary of river Satluj in Distt. Kinnaur (HP). The
Project comprises a 130m long concrete gravity Dam at
river bed level + 3370m situated near village Dairbu,
a Desilting Arrangement having 8 No. Desilting Hoppers
(4 Nos. in each row) to remove particles above +
0.20mm, a 5036m long 2.6m dia circular Head Race
Tunnel to carry a design discharge of 13.45 cumecs, a
108m high 3.5m dia restricted orifice type underground
Surge Shaft, a 825m long 2.10m dia one No. steel lined
Pressure Shaft, a 89.5m x 15.5m x 32.15m sized
underground Power House situated near village Lambar,
to house two vertical axis Pelton Turbines of total
installed capacity as 60 MW (2 x 30 MW) to generate
211.65 MU of energy annually utilizing a net head of
511.50m.
PROJECT PROFILES
6. Khoksar HEP (90 MW):-
Khoksar Hydro-electric Project has been
envisaged on river Chandra in Distt. Lahaul Spiti
(HP). The Project comprises a 21m high Barrage with
top of Dam at El. 3216.00m in village Dorni Thach
resulting to a gross storage of 155.31 Hect. m up to
FRL at EL. 3212.40m, a Spillway to pass a design flood
of 1600 cumecs, 4 Nos. 140m x 20m x 9m underground
central silt gutter type Desilting Tanks to excludes
all particles above 0.20mm, 10.055 Km long 6.3m dia
circular concrete lined Head Race Tunnel to carry a
design discharge of 101 cumecs, a 70.85m high, 21m dia
restricted orifice type Surge Shaft with top level at
EL. 3235.00 m and bottom level at El. 3164.15 m, an
underground Pressure Shaft with three branches, a 68m
x 15.75m x 27.5m sized underground Power House
situated on the left bank of river Chandra near
Khoksar to house three vertical axis Turbines of
installed capacity of 90 MW (3 x 30 MW) to generate
351.91 million units of energy annually utilizing a
net head of 99m.
7. Gharopa HEP (99 MW):-
The Gharopa Hydro-electric Project has
been contemplated as a Power Generation Development
utilizing water of river Beas in Kullu Distt. of
Himachal Pradesh. It is an upstream development of
Larji (126 MW) HEP under execution by HPSEB. The
Project comprises a 26 m high diversion Barrage
resulting to a 70.8 Hac-m gross storage Reservoir with
FRL at El 1653.50, 4 No. underground central gutter
type Desanding Basins of size 110m x 15m x 8.15m to
remove all particles of min. size 0.2mm, a 5.7 Km long
5m dia modified horse shoe shaped concrete lined HRT
to carry a design discharge of 65 cumecs, an
underground 94.50m high 15m dia Surge Shaft of
restricted orifice type, 1 No. 4.5 dia 415m long
underground main Pressure Shaft trifurcated into 50m
long 2.6 m dia branches, an under ground Power House
situated near Patlikuhl to house 3 Nos. vertical axis
Francis Turbines of capacity 33 MW (each) to generate
484.07 Million Units of energy annually by utilizing a
maximum net operating head of 173.97 m.
8. Shalvi HEP (7 MW):-
Shalvi Hydro-electric Project has been
contemplated as a run-of-the river scheme on Shalvi
Khad a tributary of river Yamuna in Chopal Tehsil of
District Shimla of Himachal Pradesh. It comprises a
Trench Weir on Shalvi Khad at EL + 960 m, an
underground Desilting Tank to remove particles above
0.2 mm size, a Water Conductor System comprising 200 m
Feeder Tunnel upto Desilting Tank and 3760 m long Head
Race Tunnel, a Forebay and 1.40 m long Penstock of 1.5
m dia and a Power House 2 x 3.5 MW on the right Bank
of Shalvi Khad. The Project will generate 49.45 MU in
75% dependable year by utilizing a gross head of
104.72 m and a design discharge of 8.34 cumes.
9. Fozal HEP (9 MW):-
Fozal Hydro-electric Project has been
contemplated as a run-of-the river scheme utilizing
the water of Fozal Nallah a tributary of river Beas in
the village Meha & Daora in Distt. Kullu (HP). The
Project comprises a boulder type Weir, a Duffour type
Desilting Tank, a 126 m long trapezoidal power channel
(open), a D-shaped 2734.6 m long Power Tunnel, Forebay
10m x 25m with sill level at 1632.958 m and full
Forebay level at 1638.949 m with a maximum discharging
capacity of 8.48 cumecs, a Penstock 1.9 m dia 330 m
long, a surface Power House 40 m x 9.5 m x 17.3 m to
house three Horizontal axis Francis turbines of
installed capacity of 9 MW (3x3 MW) to generate 46.37
Million Units of energy annually utilizing a net head
of 141.0 m.
PROJECT PROFILES
10. Sal-I HEP (6.5 MW):-
Sal Stage-I Hydro-electric Project has
been contemplated as a run-of-the river scheme
utilizing the water of Sal Nallah in Chamba District
of Himachal Pradesh. The Power House is near intake of
Bhuri Singh Power House about 7 Kms from Chamba city
and Trench Weir near Chiminnu village which is 12 Kms.
from Chamba. The Project comprises a Channel 1845 m
long, a HRT 2950 m long (2.10m D-Shaped, free flow), a
Forebay (53 m x 12 m x 3 m), 218 m long surface
Penstock (1.45m dia) and a surface Power House (27.5 m
x 14.5 m) housing two units of 3.25 MW each. The
Project will generate 31.9 million units annually by
utilizing a gross head of 120 m. Design discharge is
6.31 cumecs.
11. Kilhi Bahl HEP (7.5 MW):-
Kilhi-Bahl Hydro-electric Project is
proposed as a run-of-the river scheme utilizing the
water of Binwa Khad, a tributary of river Beas in
Distt. Kangra (HP). The Project comprises a 10 m long
drop type Trench Weir at EL + 780 m downstream of
confluence with Awa Khad, a 80 m x 12.60 m x 5.0 m
sized central silt gutter type surface Desilting Tank
to settle all the particles above 0.2 mm size, a 4 Km.
long D-shaped concrete lined free flow Head Race
Tunnel of dia 2.7 m to carry a design discharge of 11
cumecs, a 80 m x 10 m x 4.75 m sized Forebay with
storage capacity of 3300 cum, a 550 m long 1.85 m dia
surface Penstock, a 25 m x 12 m sized surface power
house to house 2 turbines of installed capacity of 7.5
MW (2x3.75 MW) to generate 41.82 Million Units of
energy annually utilizing a net head of + 81 m. The
Power House is located at EL + 690 m on right Bank of
Binwa below village Lanju Sakri about 12 Km from
Baijnath.
I. Detail of Projects to be
implemented through ICB Route.
1. Jangi Thopan HEP (480 MW):
Jangi-Thopan Hydro-electric Project
located in Kinnaur district of Himachal Pradesh, is a
run-of- the river type development proposed to harness
the hydel potential of river Satluj between Spillo and
Thopan villages. The Project envisages construction of
a 64 m high (above river bed) concrete gravity Dam on
the river Satluj near village Jangi for diversion of a
design discharge of 305 cumecs, through two Intakes
and underground Desilting Arrangement into a 7.0 km
long, 9.45m finished diameter Head Race Tunnel on the
right bank of Satluj river. The Tunnel terminates in a
26m diameter open to sky Surge Tank. The water from
Surge Tank shall be further conveyed through three
nos, each 4.65m diameter, 220 long steel Penstock to
three generating units in an underground Power House
at Thopan. A gross head of 186 m is available at the
power station, which shall be utilized to generate 480
MW (3x160MW) of power.
The annual generation in 90% dependable
year will be 1779.45 GWH and in 50% dependable year it
will be 2098.71 GWH.
PROJECT PROFILES
2. Thopan Powari HEP (480 MW):
Thopan Powari Hydro-electric Project located in
Kinnaur Distt. Of Himachal Pradesh, is a run-of-the
river type development proposed to harness the hydel
potential of river Satluj between Thopan and Powari
Villages. The Project envisages construction of a 53m
high concrete gravity Dam on the river Satluj near
village Thopan for diversion of a design discharge of
330 cumecs, through two Intakes and underground
Desilting Arrangement into a 5.84 Km. long, 9.35m,
finished diameter Head Race Tunnel on the left bank of
Satluj river. The Tunnel terminates in a 31m diameter
open to sky Surge Tank. The water from Surge Tank
shall be further conveyed through three nos., each
4.75m. dia, 320m long steel Penstock to three
generating units in an underground Power House at
Powari. A gross head of 172m is available at the
power station, which shall be utilized to generate 480
MW (3x160 MW) of power.
The annual generation in 90% dependable year
will be 1786.26 Million Units and in 50% dependable
year it will be 2091.14 Million Units.
3. Kutehar HEP (260 MW):-
Kutehar Hydro-electric Project has been envisaged on
river Ravi in Distt. Chamba (HP). The Project
comprises a 80m long gated Barrage situated about 4 Km
down stream of village Holi, 3 No. 122m x 19m x 12.25m
Desilting Tanks to remove all particles of size 0.25mm
and above, 15 Km long 6m dia circular concrete lined
Head Race Tunnel to carry a design discharge of 109
cumecs, a restricted orifice type circular Surge Shaft
with top level at El 1729.0m and bottom level at El.
1641.0m, 4.8m dia circular 310m long main Pressure
Shaft trifurcated into 70m long 2.7m dia branches, an
underground Power House situated near village Suhaga
at 1 Km upstream of Kharamukh village on the left bank
of river Ravi to house three vertical axis Francis
Turbines of installed capacity of 260 MW (3 x 86.67
MW) to generate 1075.26 Million Units of energy
annually by utilizing a net head of 275m.
4. Chamba HEP (126 MW):-
Chamba Hydro-electric Project has been
envisaged on river Ravi in Distt. Chamba of Himachal
Pradesh. The Project comprises a Diversion Structure,
100m high 15.5m dia Intake Shaft of restricted
orifice type, a 10.320 Km long 6.5m dia concrete lined
circular Head Race Tunnel to carry a design discharge
of 127 cumecs, an underground orifice type 20.50m dia
circular Surge Shaft with top level at El + 950.00m
and bottom level at El + 857.50m, an
underground/surface 400m long 5.3m dia main Pressure
Shaft trifurcated into 15m long 3.05m dia three
branches, a surface Power House located near village
Rajpura to house three Francis Turbines of total
installed capacity of 126 MW (3 x 42 MW) to generate
646.824 Million Units of energy annually by utilizing
a net head of 110 m.
The Project capacities and other details
given above are based on preliminary Pre-Feasibility
Studies. The Bidders shall be free to optimize the
same based on the investigations done by them.
Vishal Singal
Singal Hydel Consulting
+91 9888188891
Singal Hydel Consulting SHC
"Power House" # 892, Sector 12
Panchkula 134 112, HRY INDIA
Tel +91 9888188891, 9888288892
Web: http://www.himurja.com
Tapping the Power of the Himalayas
[This electronic mail transmission is confidential and
may contain
privileged information. It is intended only for the
person to whom it is
addressed. Any unauthorized dissemination,
distribution or copying is
strictly prohibited. If you have received this
transmission in error,
please delete it immediately and notify us by return
e-mail at the above
address.
This transmission was not encrypted. Please advise us
if you would
prefer to receive secure e-mail or other means of
communication in the
future.]
__________________________________
Yahoo! Mail - PC Magazine Editors' Choice 2005
http://mail.yahoo.com
------------------------ Yahoo! Groups Sponsor --------------------~-->
Get fast access to your favorite Yahoo! Groups. Make Yahoo! your home page
http://us.click.yahoo.com/dpRU5A/wUILAA/yQLSAA/FGYolB/TM
--------------------------------------------------------------------~->
Does your company feature in the microhydro business directory at
http://microhydropower.net/directory ? If not, please register free of charge
and be exposed to the microhydro community world wide!
NOTE: The advertisements in this email are added by Yahoogroups who provides us
with free email group services. The microhydro-group does not endorse products
or support the advertisements in any way.
More information on micro hydropower at http://microhydropower.net
To unsubscribe: send empty message to [EMAIL PROTECTED]
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/microhydro/
<*> To unsubscribe from this group, send an email to:
[EMAIL PROTECTED]
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/