[
http://mifosforge.jira.com/browse/MIFOS-5040?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Lukasz Chudy updated MIFOS-5040:
--------------------------------
Status: Ready for Showcase (was: Ready for Testing / Resolved)
Verified on 09.06.2011
Now, Repayment Capacity in G Release is calculated in the same way as in 2.1.x
NOTE:
In 2.1.x repayment capacity is 998.65%, in G Release is 998.77%. This slight
difference is related to the last installment amount which is 507.1 in G and
507.4 in 2.1.x
> Repayment Capacity is not properly calculated in G Release
> ----------------------------------------------------------
>
> Key: MIFOS-5040
> URL: http://mifosforge.jira.com/browse/MIFOS-5040
> Project: mifos
> Issue Type: Bug
> Components: Loan Account
> Affects Versions: Release G
> Reporter: Lukasz Chudy
> Assignee: mifosqa
> Priority: Major
> Fix For: Release G - Iteration 9, Release G
>
>
> Repayment Capacity is not properly calculated in G Release comparing to
> calculation in 2.1.x
> Repro:
> 1. Login to Mifos and make sure that Loan product has these settings:
> Can configure variable installments: Yes
> Minimum gap between installments: 1 days
> Maximum gap between installments: N/A
> Minimum installment amount: N/A
> Compare with Cash Flow: Yes
> Warning Threshold: 89.99 %
> Indebtedness Rate: 49.99 %
> Repayment Capacity: 999.99 %
> 2. Click on 'Create new Loan account' link.
> 3. Select any client and loan product which has above settings.
> 4. On 'Enter Loan account information' page, set:
> Loan amount: 2500
> Interest rate: 19
> Number of installments: 5
> 5. Click on Continue button.
> 6. On Cash Flow page fill the following fiels with data:
> All Expenses with: 100
> All Revenues with: 5685
> Total Capital: 7003
> Total Liability: 1000
> 7. Click on Continue button.
> 8. On Review installments page click 'Validate' or 'Preview' button.
> Expected result:
> Validation message appears: "Repayment Capacity of the client is 998.65 %
> which should be greater than the required value of 999.99 %". This message
> appears in 2.1.x
> Actual result:
> In G Release, validation message doesn't appear and it is possible to
> continue. Probably the problem is that Repayment Capacity calculated in G
> Release is the value greater than 999.99%.
--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira
------------------------------------------------------------------------------
EditLive Enterprise is the world's most technically advanced content
authoring tool. Experience the power of Track Changes, Inline Image
Editing and ensure content is compliant with Accessibility Checking.
http://p.sf.net/sfu/ephox-dev2dev
_______________________________________________
Mifos-issues mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/mifos-issues