Well, This is my first attempt at moving from Oracle to MySQL on such a large scale and so far it isn't going well at all. We are running oracle 7.3.4.0.1 and MySQL 4.0.4-0 standard. We are moving 101 tables with a total of 45 millon records over. I have tried several diffrent methods including using a MS-SQL server to act as go between using DTS services. We have run into two problems, one, we don't get all the data over we loose rows and the like. Two it is super slow on the order of 18 to 30 hours to do a pull. We need a way to move the data in a resonable amount of time around 8 hours is the goal. Things I have tried so far include using MS-SQL as a go between fast but with data loss, using a custom ADO application to move the data and handle any transforms we get the data but it REAL slow, and trying to get the oracledump.pl perl script to run with no success. If anyone has had a chance to do this type of migration please point me in the right direction. I would really hate to stay with Oracle for the only reason that we can't get the data off of it and on to another box :)
Thanks, Wes --------------------------------------------------------------------- Before posting, please check: http://www.mysql.com/manual.php (the manual) http://lists.mysql.com/ (the list archive) To request this thread, e-mail <[EMAIL PROTECTED]> To unsubscribe, e-mail <[EMAIL PROTECTED]> Trouble unsubscribing? Try: http://lists.mysql.com/php/unsubscribe.php