Monday or Tuesday of next week I will start building the clock kit. I will 
start posting pictures of the build then.

I also finished the final prints and spreadsheet for the stand and brought 
them to the shop the get the four plates made and drilled with the pilot 
holes. They will also mill the backside of the inner and outer rear plates 
to .125" thickness so the switches , LED's , Power connector and PIR jack 
will fit properly.

After I get done the plates should look like this. Then back to the shop 
for getting the bottom curve and sides milled to the proper shape.

<https://lh3.googleusercontent.com/-rGn6QPiItrk/WaDci2TYUMI/AAAAAAAAAXc/2J-NCuucW5sLrax4YJAkTVS4-pKRg9CUgCL4CGAYYCw/s1600/IMG_3734ss%2B%25282%2529.jpg>
Ok finally figured out how to post the pictures.

Full steam ahead:)


-- 
You received this message because you are subscribed to the Google Groups 
"neonixie-l" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to neonixie-l+unsubscr...@googlegroups.com.
To post to this group, send an email to neonixie-l@googlegroups.com.
To view this discussion on the web, visit 
https://groups.google.com/d/msgid/neonixie-l/3a162ef0-cae2-431f-8c90-e833b956fc56%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to