Do we have a target date for the development board production run? My engineering/nerd nature is chomping at the bit to start working on some real hardware. :) The VGA core especially is a good bit harder to simulate in software effectively than say the 2D/3D core is.
Just curious. Plus, it let's me know when I need to start saving up and convincing my wife to let me spend the money. :) Patrick M --- Timothy Miller <[EMAIL PROTECTED]> wrote: > There's a certain fall-out rate when chips are produced. We could > have the fab house send us the bad ones separately and we could sell > them for a few bucks apiece. :) > > On 4/28/05, Patrick McNamara <[EMAIL PROTECTED]> wrote: > > So, I'll go on record as wanting to get a development card (maybe two). > I'll > > also want to get a production ASIC card (probably two), as well as a bare > ASIC. > > > > Because someone is going to ask what I want a bare ASIC for, I share ahead > of > > time. I'm surrounded by professional chip designers on a daily basis. > When we > > finally succeed in getting a shipping product, it will be something all of > us > > should be proud of. That bare ASIC is going to be embedded in Lexan, > framed, > > and hung on my cube wall. :) I'm considering doing the same thing with > one of > > the production cards. > > > > Patrick M > > _______________________________________________ > > Open-graphics mailing list > > [email protected] > > http://lists.duskglow.com/mailman/listinfo/open-graphics > > List service provided by Duskglow Consulting, LLC (www.duskglow.com) > > > _______________________________________________ Open-graphics mailing list [email protected] http://lists.duskglow.com/mailman/listinfo/open-graphics List service provided by Duskglow Consulting, LLC (www.duskglow.com)
