See Duke Energy Catawba Nuclear Station responses in red below...

From: [email protected] [mailto:[email protected]] On Behalf Of 
Wayne L Ruttenberg
Sent: Monday, July 26, 2010 13:50
To: [email protected]
Subject: Powernet: ALARA Benchmarking Questions


Good Afternoon Everyone

Fermi-2 would like assistance with the following questions:

What is your routine survey frequency for the general areas of the following

Turbine Building - semiannual
Reactor Building - lower containment only during outages...upper containment 
quarterly
Auxiliary Building - RCA exits are daily...most other rooms/areas are monthly


Are ARMs used to supplement the survey frequency?  We have over 300 remotely 
monitored ED's throughout our Aux Bldg that we monitor continuously.  However, 
to minimize dose they are not calibrated (run to failure) so we do not take 
credit for them to further extend the frequency of our routine surveys.


What is the primary driver for the use of remote monitoring ( Procedurally and 
/or the RWP, Dose for the job or to reduce access to HRA or LHRA areas)?  Dose 
reduction/minimization.


What equipment is available to perform remote monitoring (Crash carts with 
video communications, telemetry or centralized monitoring station)?  Crash 
carts with telemetry and video for the majority of the Aux Bldg during on-line 
periods...Central monitoring for both spent fuel buildings (ISFSI activities) 
at all times...central monitoring with telemetry, video, and audio 
communications in reactor bldg during outages.


Is there an issue with "Free Air" cables at your facility  ?


What are your primary ALARA metrics?  On-Line Exposure (by unit and either 
Routine or Non-Routine)...outage exposure (by unit)...fleet cumulative 
exposure...high radiation area occurrences...and unplanned exposure occurrences.

Thank you for your assistance

Wayne Ruttenberg
ALARA @ Fermi-2
(734) 586-5306