Robinson Response - We also have four levels of use:
Informational, Reference, Continuous, and Multiple Many/most of our RP procedures are Informational (routine surveillance, release, posting and labeling). Second most frequent would be Reference - Almost all of our instrument calibration procedures are Reference Use, our diving procedure and Cavity Decon are examples. We have Continuous Use procedures for activities where plant equipment must be operated - Wash Down of Cavity Walls during drain down, calibration of tech spec radiation monitors, sluicing resin to a HIC, Dewatering resin for burial are examples of continuous use. Place keeping is required for continuous use and in some cases for reference use procedures as well (by management expectation). ________________________________ From: [email protected] [mailto:[email protected]] On Behalf Of Benjy P Bertossi Sent: Tuesday, June 07, 2011 7:13 AM To: [email protected] Subject: Powernet: Procedure classification What is 'typical' classification for site RP procedures, C = continuous use, R = reference use, I = information . Reference INPO 09-004 RP equipment operation Most are Informational Use RP equipment calibration Most are Reference Use RWP / ALARA Reference Job Coverage Informational Posting Informational Use Shipping mostly reference, some continuous Thanks, Benjy Benjy Bertossi Fermi2 - RP Supervisor 734-586-4935 [email protected] [cid:[email protected]]Benjy P Bertossi ---06/07/2011 09:34:05 AM---Fermi - Tc99, sources are used, desired to meet the criteria of 5000 beta/min emission rate referenc From: Benjy P Bertossi <[email protected]> To: [email protected] Date: 06/07/2011 09:34 AM Subject: RE: Powernet: What sources do you use for personnel monitor Sent by: [email protected] ________________________________ Fermi - Tc99, sources are used, desired to meet the criteria of 5000 beta/min emission rate referenced in EPRI RAM Monitoring & Control, 1019224 Benjy Bertossi Fermi2 - RP Supervisor 734-586-4935 [email protected]
<<inline: image001.gif>>
