See response for Robinson below From: [email protected] [mailto:[email protected]] On Behalf Of PEREZ, DIANA Sent: Tuesday, August 30, 2011 11:36 AM To: [email protected] Cc: FOGLE, RICHARD R Subject: Powernet: Low-level Spent Resin Transfers
V. C. Summer would appreciate your response to the following questions regarding low-level spent resin transfers. If you prefer, please reply directly to Ryan Fogle at [email protected]<mailto:[email protected]> Thanks in advance for your assistance, Diana Pérez 1. How is low-level spent resin transferred at your facility? · With a resin sluice hose directly connected via camlock fitting to a Poly HIC/CS Liner? No · With fill head for all types of resin transfers? SEDS unit is used to perform sluice/transfer · Other method? Please specify: 2. Does your site transfer low-level spent resin to B-25 boxes? If so, what is the process for transferring the resin media to the boxes? No 3. Do your procedures capture which demin beds are used to remove specific isotopes? No 4. What level of procedure usage do you apply to these processes? Operations and Radwaste procedures involved, both are Continuous Use
