Fermi - DAC-hr tracking begins with air sample analyses results of > 0.3 DAC fraction
Benjy Bertossi Fermi2 - RP Supervisor 734-586-4935 [email protected] From: "Creamer, Charles E" <[email protected]> To: <[email protected]> Date: 08/14/2012 12:38 PM Subject: Powernet: DAC hr Tracking Sent by: [email protected] Browns Ferry Procedures currently require air samples with a total percent DAC of equal to or greater than 30 shall be assigned to the individuals on the applicable RWP(s). Our TVA Corporate level procedures do not require DAC-hr tracking until you get levels greater than 1 DAC. At what level does your facility track DAC hours? Chuck Creamer Charles E. Creamer Health Physicist Tennessee Valley Authority Browns Ferry Nuclear Plant P.O. Box 2000 (Mail Stop NAB-1G-BFN) Decatur, Al. 35609-2000 Phone: 256-729-2983 Fax: 256-729-3101 Pager: 1-800-323-4853, pin 30-053 mailto:[email protected]
<<inline: graycol.gif>>
<<inline: pic26613.jpg>>
