Salem/Hope Creek  evaluates air samples for potential DAC hour tracking at > 1 
DAC(summation of particulate, tritium, Iodine) -this is based on a presumed 4 
hour exposure time.

Susanne Ziegler
PSEG Radiation Protection
Hope Creek Generating Station
PO Box 236, MC H05
Hancocks Bridge, NJ 08038
856-339-5143
FAX 856-339-3336

Gadugi-working together for a common good




________________________________
From: [email protected] [mailto:[email protected]] On Behalf Of 
Creamer, Charles E
Sent: Tuesday, August 14, 2012 12:39 PM
To: [email protected]
Subject: Powernet: DAC hr Tracking


Browns Ferry Procedures currently require air samples with a total percent DAC 
of equal to or greater than 30 shall be assigned to the individuals on the 
applicable RWP(s).

Our TVA Corporate level procedures do not require DAC-hr tracking until you get 
levels greater than 1 DAC.

At what level does your facility track DAC hours?


Chuck Creamer
Charles E. Creamer
Health Physicist
Tennessee Valley Authority
Browns Ferry Nuclear Plant
P.O. Box 2000 (Mail Stop NAB-1G-BFN)
Decatur, Al. 35609-2000
Phone: 256-729-2983
Fax:  256-729-3101
Pager: 1-800-323-4853, pin 30-053
mailto:[email protected]



-----------------------------------------
The information contained in this e-mail, including any
attachment(s), is intended solely for use by the named
addressee(s).  If you are not the intended recipient, or a person
designated as responsible for delivering such messages to the
intended recipient, you are not authorized to disclose, copy,
distribute or retain this message, in whole or in part, without
written authorization from PSEG.  This e-mail may contain
proprietary, confidential or privileged information. If you have
received this message in error, please notify the sender
immediately. This notice is included in all e-mail messages leaving
PSEG.  Thank you for your cooperation.

<<inline: image001.jpg>>

Reply via email to