Palo Verde provides the following response: 

Yes, Palo Verde requires a review by a supervisor or designated technicians of 
each radiation and contamination survey. 

Radiation and Contamination are quality assurance records with a lifetime 
retention requirement (lifetime of the plant). This is defined in ANSI N45.2.9 
- 1974, Requirements for Collection, Storage, and Maintenance of Quality 
Assurance Records for Nuclear Power Plants.

Section 3.2.1 describes the generation of records. This section describes the 
signature requirements. "The applicable quality assurance records shall be 
considered valid only if stamped, initialed, signed, or otherwise authenticated 
and dated by authorized personnel. These records may be either the original or 
a reproduced copy."

ANI Information Bulletin 80-1A rev 6 describes what should be on a survey:
*       Location
*       Date
*       Time
*       Survey information
*       Technician signature
*       Instrument
*       Reference to RWP
*       Other information which may be important

A supervisor review or second party verification is not strictly required. 
However surveys are required for liability purposes and to comply with 
regulations. Therefore, a review to verify the adequacy of the survey is 
prudent.


                              Gordon Nelson
                              Radiological Engineering
                              Palo Verde Nuclear Generating Station
                              Phone (623) 393-5200
                              Fax   (623) 393-1853
                              Cell  (623) 238-0542
                              Pager (877) 466-7534
                              [email protected]

    

-----Original Message-----
From: [email protected] [mailto:[email protected]] On Behalf Of 
Orionhp
Sent: Tuesday, September 10, 2013 6:26 AM
To: [email protected]
Cc: Betsy Meek
Subject: Powernet: Review of radiation and contamination surveys

Does your facility require a reviewer to approve/sign off on each radiation and 
contamination survey that is completed?
If you do, where do you see in regulations or other documents the requirement 
for this approval/review?

Thank you in advance
Tom Meek, CHP
-----------------------------------
Powernet - a service of the Health Physics Society Power Reactor Section

Powernet archives at http://www.mail-
archive.com/[email protected]/

Reply to: [email protected]
If Questions, contact Mike Russell, CHP at [email protected]
--- NOTICE ---

This message is for the designated recipient only and may contain confidential, 
privileged or proprietary information.  If you have received it in error, 
please notify the sender immediately and delete the original and any copy or 
printout.  Unintended recipients are prohibited from making any other use of 
this e-mail.  Although we have taken reasonable precautions to ensure no 
viruses are present in this e-mail, we accept no liability for any loss or 
damage arising from the use of this e-mail or attachments, or for any delay or 
errors or omissions in the contents which result from e-mail transmission.

-----------------------------------
Powernet - a service of the Health Physics Society Power Reactor Section