Palisades has an Entergy Fleet procedures that directs a stand-alone report 
annually.  This report reviews/summarizes various inspection areas and is used 
for future assessment schedules.  This is done in addition to the site/fleet QA 
assessments that are structured/used to meet the regulatory requirements.


Mike Ginzel

From: [email protected] [mailto:[email protected]] On Behalf Of 
emgoldin
Sent: Friday, February 07, 2014 1:40 PM
To: [email protected]
Subject: Powernet: Annual RP Program Review


Hi all,   10CFR20.1101(c) requires an annual review of the RP program.  Some 
plants have prepared a stand-alone report that documents detailed reviews of 
all program aspects, the QA audits, NRC inspections, INPO evaluations, 
performance metrics, etc.   Question 118 in NUREG/CR-6204, post-Part 20 
revision in the early ‘90’s, implied that the requirement could be met if 
sufficient oversight reviews were made during the year.

I’d like to know how many plants document a stand-alone report (resource 
intensive) and how many rely on a compilation of audits and inspections to meet 
the regulatory requirement.  If the latter, do you have a formal process 
(procedure driven) or just gather the info when the NRC inspector comes calling?

Thanks,

Eric Goldin, CHP

Sent from my Verizon Wireless 4G LTE Smartphone

Reply via email to