1. Yes, GEM-5 a. Yes
b. Yes c. Workers inside the PA must successfully pass through a GEM-5 inside the Security Access Control Building/PA exit. There is no passable route around the GEM-5s w/o alarming them and security officers are stationed next to GEM-5s, and attentive to the (very rare) alarms. * RP does not have to be notified when a worker drops off their TLD (in a designated drop box) before they exit the PA. * For a worker terminating and already outside the PA (Training, Engineering, off-site vendors...) their last PA exit (through GEM-5) is used as their passive monitoring count. * RP does provide a contact number for immediate notification if Form-5 is desired or address change is required. 2. Yes. Workers are required to contact RP prior to departure for other site. After discussing travel particulars with the worker, we will either restrict access and hold the TLD in Dosimetry until their near-term return, or terminate their monitoring and reinstate it when they return if we suspect they'll be monitored during their travels. Dave Raye RP Support Gen Supv Cook Nuclear Plant 269.466.2803 (w) 269.405.6040 (c) 269.422.6161 (h) Pager 2803 From: Macho, Michael [mailto:michael.ma...@luminant.com] Sent: Monday, September 19, 2016 9:25 AM To: powernet@HPSpowernet.org Subject: [powernet] Sending out again for more help on this: Radiation Worker Entry and Exit WBCs - Passive monitor or Gamma Spec FSCAN? This is an EXTERNAL email. STOP. THINK before you CLICK links or OPEN attachments. ________________________________ Benchmarking other Utilities: 1) Do you use a passive monitor similar to GEM5/PM7 when issuing and terminating TLD/OSL use for personnel RCA Access? a. Do you use a passive monitor for Entry(Issuing TLD/OSL)? Yes /No b. Do you use a passive monitor for Exit (permanently leaving site and removal of TLD/OSL use)? Yes/No c. Is there any process or controls put in place to ensure notification when they leave permanently when a passive monitor is used (if so, what is the method used)? 2) Do you remove RCA access (contactors or Utility personnel) at your facility when performing short term duties at other Nuclear facilities (e.g., Benchmarking, Assessments, outage support,) or short term medical leave, military duty? We have contractors (e.g., engineering contract personnel working out of Dallas) that periodically come on-site). Michael Macho Radiation Protection Supervisor [cid:image004.png@01D215B5.68986F50] Luminant Power Comanche Peak Nuclear Power Plant 6322 North FM 56 or PO Box 1002 Mail Code 005A Glen Rose, TX 76043 (254)897-5698