FWIW: While chatting w/ Riv folks awaiting my Bomba's arrival, they told me a lot about how its built. The diagonal mid-tube is the same as the top tube; and the seat tube is also the same tubing, which gets sized (why it has a 26.8 instead of a 27.2 seatpost); those and the downtube are all OX PLAT. Waterford builds the frames, the lugs/tubes assembly, but then Mark N. adds on the curva-stays that run from the diagonal at the middle of the seat tube to the stays (to a seat stay on one side, the other side to a chainstay). Took awhile for the frame to get built, as they had a new lug coming for doing the diagonal; but the extra time meant the new wider fork-crown arrived, too; which is why the NeoMoto 2.3's fit with lots of leftover clearance.
-- You received this message because you are subscribed to the Google Groups "RBW Owners Bunch" group. To view this discussion on the web visit https://groups.google.com/d/msg/rbw-owners-bunch/-/90_hsAaSSBgJ. To post to this group, send email to rbw-owners-bunch@googlegroups.com. To unsubscribe from this group, send email to rbw-owners-bunch+unsubscr...@googlegroups.com. For more options, visit this group at http://groups.google.com/group/rbw-owners-bunch?hl=en.