I shall have a look into this. It shouldn't be much effort to tweak my current code to do this.
A rough guess says maybe 3 weeks to get a prototype designed and built. Can't promise this, as it relies on me getting some parts in, and it's really not worth the £5 shipping on £1 of goods, so next time I'm in the electronics shop I'll get the stuff I need. Chris Malton Assets: FA006, T027 On 08/07/2009 15:43, Modena wrote: > >> A couple questions: >> >> 1) When do you need it done? >> >> 2) What range for X and Y would you like to have? >> >> Frank P. > > 1) anytime - I'm not ready for it yet, but will be in a few weeks > > 2) I am almost totally guessing here, but I think for X (dwell time) > it would need to be in the order 0.005 - 0.050 of a second (5 - 50 > milliseconds). I have not been able to find a lot of info on > manufacturers dwell time, but from what I have found that sounds about > right. For Y (reload time) I would think adjustable between 0.5 - 5 > seconds. > > For X I have no idea if my valve can switch on and off that fast, > trial and error will have to sort that out, along with pressure > adjustments. > > --~--~---------~--~----~------------~-------~--~----~ You are currently subscribed to the "R/C Tank Combat" group. To post a message, send email to rctankcombat@googlegroups.com To unsubscribe, send email to rctankcombat-unsubscr...@googlegroups.com Visit the group at http://groups.google.com/group/rctankcombat -~----------~----~----~----~------~----~------~--~---