I was sent to look at another contractor's work, and found three SB5000 inverters with blown string input fuses. I was able to determine the reason pretty quickly, and was later sent the original 1-Line, which was installed per the drawings. The 1-Line came from a "leading system integrator" who shall remain nameless.
See anything wrong? https://www.sugarsync.com/pf/D6539806_8669786_010829 Just goes to show you - the contractor needs to take responsibility and verify the specifications are correct, safe, and code compliant. Jason Szumlanski Fafco Solar
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org