I was sent to look at another contractor's work, and found three SB5000
inverters with blown string input fuses. I was able to determine the reason
pretty quickly, and was later sent the original 1-Line, which was installed
per the drawings. The 1-Line came from a "leading system integrator" who
shall remain nameless.

See anything wrong?

https://www.sugarsync.com/pf/D6539806_8669786_010829

Just goes to show you - the contractor needs to take responsibility and
verify the specifications are correct, safe, and code compliant.