My understanding of UL3741 is that you need to have the racking system, the
shutoff units (often string level shutdown units), and the inverter all
listed to work with each other.  So far, I have been unable to find any
combination that does what I need (specifically, any battery based
inverters other than Tesla that are listed with shutdown units and
racking), so I've still been using module level shutdown.  ul3741.com has
lists of what is cross listed with what else.

Zeke


-- 
Zeke Yewdall
PV Engineer
NABCEP #031508-89
[email protected]
303-523-3592
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to