Put together my first modular layout under and around the tree this year I had (4) 4 x 
8 sheets 0f 1/2" plywood and ran 4 tracks as well as a bunch of accessories. Worked 
well but looking to improve for next year. The layout is up 6 weeks a year before the 
wife wants the living room back (we have no basements in Texas, and running trains in 
a non air conditioned garage during summer is not an option) 
    On the plywood I laid down felt cloth to simulate snow and nailed my flyer track 
down (mostly with roadbed)
Looking for some comments.
    Ground covering- since this is put up around Christmas I want to stay with the 
Christmas theme. I would like something a bit more realistic than my felt cloth but I 
do need something durable as many areas need to be stepped on to assist errant trains.
    Linking modules together-Track was secured in place except for a piece closest to 
each edge. I would butt modules together and then connect the two pieces of loose 
track (one on each module together) Any better ideas.
Controls- exclusivly flyer push buttons. They worked fine, but any other ideas. 
    I appreciate any feedback. Steve Roche


[Non-text portions of this message have been removed]


S-Trains list sponsor: http://www.americanflyertrains.com
All the Flyer you desire...books and accessories too!

To UNSUBSCRIBE from this list send a note to [EMAIL PROTECTED] 

Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/ 


Reply via email to