If I understand the process correctly, when the first cycle is run on the start of SA you gather a status and datetime. When the status changes, the duration is calculated, the datetime is reset, the new status is recorded. Then an appropriate entry is written to the database.
If that's correct, then when SA is stopped/restarted, all of the "running time" info is lost from the last program start or last status change. Would it be possible to output all of the current "running time" info for each check to the database before SA shuts down (assuming a gracefull shutdown)? Maybe record the current status as the same for both last and new. I'm trying to get the most out of this database, but I can't calculate an accurate quality % if I don't have all of the up times. Thanks!!!! Michael Shook Business Continuity Analyst Saddle Creek Corporation 723 Joe Tamplin Industrial Blvd Macon GA 31217 478 742 8740 ext. 105 (work) 478 256 9318 (mobile) 478 742 7917 (fax) [EMAIL PROTECTED] http://www.saddlecrk.com To unsubscribe from a list, send a mail message to [EMAIL PROTECTED] With the following in the body of the message: unsubscribe SAlive