[Elecraft] K2 #4948
Completed Well almost a problem ( mine ) on 20m but it will be fixed in due time Whe! "rc" kc5wa -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.323 / Virus Database: 267.6.6 - Release Date: 6/8/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948
Assembly Part III Completed. Resistance checks within specifications. assembling case for Alignment and Test, Part III -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.1 - Release Date: 6/2/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] k2 #4948 status
Alignment and Test Part II completed Everything seems to be within specifications. Although 40m seem not to be active at this time the XG1 allowed me to peak the inductors L1 & L2 at 1uv levels. Hot Doggies -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.1 - Release Date: 6/2/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948 status
Assembly Part II completed. Resistance checks within specs Alignment & Test, Part II on page 60, NEXT -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.1 - Release Date: 6/2/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948 status
I just finished Alignment and Test, Part I... Will begin Assembly, Part II. Maybe tonight after the Baseball game. First a couple of points. It was on this reflector about how to install the Tilt Bail and until I remember it I really struggled with it. Using 4 very long (1.5") 4-40 screws I loosely attached the bail. After tightening them and aligning the bail and feet I replaced each screw with the recommended length screw, nut and lock washer. During the Part I, tests I noticed that LED BAR GRAPH segment 2 & 3 didn't light up I'm thinking a badly soldered pair of pins AND on the LCD display the Segment above the letter "A" part of the segment doesn't lite "B's" look like "E's" again I'm thinking of solder connections. At present I don't want to unassemble #4948 to look for them with additional information. OBTW I did build the RF PROBE, FREQ COUNTER PROBE & VOLT METER PROBES to use the on board systems -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.1 - Release Date: 6/2/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948 status
I have reached that portion in the RF Board Assembly titled "Alignment and Test, Part I" on page 42. Everything to this point has been a breeze ( exception being the Tilt Bail, [it took an hour to install] which I believe was designed to satisfy a designers twisted mind [g] ) "rc" kc5wa -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.1 - Release Date: 6/2/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948
progress update on K2 #4948 Front Panel Completed Next up RF Board "rc" kc5wa -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.0 - Release Date: 6/1/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
Re: [Elecraft] K2 #4948 snag
"RC" KC5WA wrote on 06/01/05 09:50 ET: > On page 26 right coluum last instruction reads > "Place two 3/4" (19mm) spacers over the leads > of each back light LED as shown in Figure 5-9" > - > Now to the best of my knowledge NO SPACERS > such as those described fig 5-9 were in the parts list. > Unless it is the two 8mm x 8mm square black pads. > and these need two be split in half and stacked to get > the required 1/8 spacing on the diffuser. Thanks for > any help... RC, The spacers are the little pieces you previously will have snapped off of the switch spacing tool. 73, Mike AB3AP ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948 snag
On page 26 right coluum last instruction reads "Place two 3/4" (19mm) spacers over the leads of each back light LED as shown in Figure 5-9" - Now to the best of my knowledge NO SPACERS such as those described fig 5-9 were in the parts list. Unless it is the two 8mm x 8mm square black pads. and these need two be split in half and stacked to get the required 1/8 spacing on the diffuser. Thanks for any help... de "rc" kc5wa -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.4.0 - Release Date: 6/1/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com
[Elecraft] K2 #4948
Progress on K2 #4948. Control PCB completed. Resistance checks look very good. Next up front Panel. de "rc" kc5wa -- No virus found in this outgoing message. Checked by AVG Anti-Virus. Version: 7.0.322 / Virus Database: 267.3.1 - Release Date: 5/31/2005 ___ Elecraft mailing list Post to: Elecraft@mailman.qth.net You must be a subscriber to post to the list. Subscriber Info (Addr. Change, sub, unsub etc.): http://mailman.qth.net/mailman/listinfo/elecraft Help: http://mailman.qth.net/subscribers.htm Elecraft web page: http://www.elecraft.com