Hi Marcin,
Marcin Borkowski mb...@wmi.amu.edu.pl writes:
Just a few seconds ago I experienced something similar (I was changing
the TODO state, and there was *no* SCHEDULED keyword anywhere (!) in
the file). I diffed the only buffer that changed (the current one) to
the saved version, and
* Marcin Borkowski mb...@wmi.amu.edu.pl wrote:
Dnia 2013-04-18, o godz. 10:53:30
Karl Voit devn...@karl-voit.at napisał(a):
* Bastien b...@gnu.org wrote:
Hi Karl,
Karl Voit devn...@karl-voit.at writes:
Sorry for the late reply. This is because I do have troubles to
come up with a
Dnia 2013-04-18, o godz. 10:53:30
Karl Voit devn...@karl-voit.at napisał(a):
* Bastien b...@gnu.org wrote:
Hi Karl,
Karl Voit devn...@karl-voit.at writes:
Sorry for the late reply. This is because I do have troubles to
come up with a minimal example. Starting Emacs with debug-init
Hi Karl,
Karl Voit devn...@karl-voit.at writes:
Sorry for the late reply. This is because I do have troubles to come
up with a minimal example. Starting Emacs with debug-init does not
show this issue. I guess I have to strip down my config until this
behavior changes (or add el-configs step
* Bastien b...@gnu.org wrote:
Hi Karl,
Karl Voit devn...@karl-voit.at writes:
Sorry for the late reply. This is because I do have troubles to come
up with a minimal example. Starting Emacs with debug-init does not
show this issue. I guess I have to strip down my config until this
behavior
* Bastien b...@gnu.org wrote:
Hi Karl,
Hi!
Karl Voit devn...@karl-voit.at writes:
I just checked out the most current Org from git (1af215bb4668bf)
and found out that with removing SCHEDULED or DEADLINE using C-u C-c
C-(s|d) I get:
Entry repeats: DEADLINE: 2013-04-15 Mon +1w -0d
Hi!
I just checked out the most current Org from git (1af215bb4668bf)
and found out that with removing SCHEDULED or DEADLINE using C-u C-c
C-(s|d) I get:
Entry repeats: DEADLINE: 2013-04-15 Mon +1w -0d
in the minibuffer line (example is from removing DEADLINE). The
heading does not have
Hi Karl,
Karl Voit devn...@karl-voit.at writes:
I just checked out the most current Org from git (1af215bb4668bf)
and found out that with removing SCHEDULED or DEADLINE using C-u C-c
C-(s|d) I get:
Entry repeats: DEADLINE: 2013-04-15 Mon +1w -0d
I can't reproduce this. Can you