>> *From:* jenkins...@googlegroups.com [mailto:
>> jenkins...@googlegroups.com ] *On Behalf Of *Åsmund Østvold
>> *Sent:* 28 October 2013 17:34
>>
>> *To:* jenkins...@googlegroups.com
>> *Subject:* Re: build flow, early exit from parallel
s@googlegroups.com [mailto:
> jenkinsci-users@googlegroups.com] *On Behalf Of *Åsmund Østvold
> *Sent:* 28 October 2013 17:34
>
> *To:* jenkinsci-users@googlegroups.com
> *Subject:* Re: build flow, early exit from parallel construct?
>
> ** **
>
> Thank you James, ***
Østvold
Sent: 28 October 2013 17:34
To: jenkinsci-users@googlegroups.com
Subject: Re: build flow, early exit from parallel construct?
Thank you James,
I finally freed up some time and was able do a new stab at this. I have
inlined some questions and feedback.
On Fri, Oct 25, 2013 at 6:33 AM, James
Thank you James,
I finally freed up some time and was able do a new stab at this. I have
inlined some questions and feedback.
On Fri, Oct 25, 2013 at 6:33 AM, James Nord (jnord) wrote:
> KillRunningjobs is called internally if the flow is aborted (or one of
> the jobs is aborted).
>
> Interna
Equal(Result.FAILURE)
/James
From: jenkinsci-users@googlegroups.com
[mailto:jenkinsci-users@googlegroups.com] On Behalf Of Åsmund Østvold
Sent: 24 October 2013 14:28
To: jenkinsci-users@googlegroups.com
Subject: Re: build flow, early exit from parallel construct?
thank you James,
I will have a
ers@googlegroups.com] *On Behalf Of *Åsmund Østvold
> *Sent:* 24 October 2013 08:22
> *To:* jenkinsci-users@googlegroups.com
> *Subject:* build flow, early exit from parallel construct?
>
> ** **
>
> Build Flow Plugin very useful plugging.
>
> ** **
>
>
exit from parallel construct?
Build Flow Plugin very useful plugging.
Is it possible to get the parallel construct to "terminate" still executing
jobs at first job exiting with none success? Or at least early fail the
job/section containing the parallel construct.
Use case is tha
Build Flow Plugin very useful plugging.
Is it possible to get the parallel construct to "terminate" still executing
jobs at first job exiting with none success? Or at least early fail the
job/section containing the parallel construct.
Use case is that I have a total long(30min) check-in regressio