Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-14 Thread Ed Willink

Hi

AFAIAA it involves a fair amount of manual renaming. See 
https://wiki.eclipse.org/OCL/Dev/Releng/Quiet_Week


It would be great if the PMI could be configured with the final 
'non-release' artifacts, e.g. RC2, so that all the other little details 
like mirrors happen automatically and correctly in the true release 
artifacts.


    Regards

        Ed Willink


On 14/06/2019 11:36, Alexander Fedorov wrote:
This part of the process is really unclear. What is the right way to 
promote "RC2" to "R" for the particular SimRel+1week contribution?


Regards,
AF

14.06.2019 12:56, Markus Knauer пишет:

Hmm, big surprise...
I just realized, too, like so many other people that there is no RC3. 
That should have been communicated better.


The current EPP builds are really "RC2" builds and not a "R" (GA) 
build. That still needs to be done, and will take some more time.


Regards,
Markus


On Thu, 13 Jun 2019 at 18:24, Greg Watson <mailto:g.wat...@computer.org>> wrote:


I can live without it :-)

I agree with Doug though, it should probably be better documented
when the last contribution can be made. Since the iterations come
so frequently now, it’s hard to keep up with where we are in a cycle.

Regards,
Greg


On Jun 13, 2019, at 12:10 PM, Doug Schaefer
mailto:dschae...@blackberry.com>> wrote:

If that's the rule, it should really be captured here:

https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan

Also interesting that the GA date keeps getting earlier. We're
in mid-June territory now...

Doug.


From:cross-project-issues-dev-boun...@eclipse.org

<mailto:cross-project-issues-dev-boun...@eclipse.org>[cross-project-issues-dev-boun...@eclipse.org
<mailto:cross-project-issues-dev-boun...@eclipse.org>] on behalf
of Frederic Gurr [frederic.g...@eclipse-foundation.org
<mailto:frederic.g...@eclipse-foundation.org>]
Sent: Thursday, June 13, 2019 12:04 PM
To:cross-project-issues-dev@eclipse.org
    <mailto:cross-project-issues-dev@eclipse.org>
    Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release
Candidate 2 (RC2) staging repo is complete

Hi,

The quiet period officially starts tomorrow, but the EPP build
is always
on a Thursday. Unfortunately, last minute contributions have
started to
bleed into Thursday for a while now, even though they should be
done by
Wednesday EOB.

Are you okay with leaving out that change?

Regards,

Fred

On 13.06.19 17:58, Greg Watson wrote:

No, not critical, but I thought tomorrow was the start of the
RC2 quiet period?

Greg


On Jun 13, 2019, at 11:45 AM, Frederic Gurr
mailto:frederic.g...@eclipse-foundation.org>> wrote:

Hi,

Is this a critical fix?

Regards,

Fred

On 13.06.19 16:24, Greg Watson wrote:

I have an update that only went into the build today because
a previous Gerrit changeset was never validated. Is it
possible to run the aggregation again today? Sorry for the
last minute issue.

Thanks,
Greg


On Jun 13, 2019, at 9:43 AM, Frederic Gurr
mailto:frederic.g...@eclipse-foundation.org>> wrote:

Hi,

Since the SimRel aggregator build is quiet, I declare the
staging repo
for 2019-06 RC2 to be complete.

As usual, it can be found here:


=>https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=

Please note, we will enter quiet days for 2019-06. If no
blocking
issues are found, RC2 will become the official 2019-06
release on
Wednesday, June 19th.

Thanks for all your contributions and happy _quiet_ days!

Regards,

Fred




--
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH

Annastr. 46, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
<mailto:cross-project-issues-dev@eclipse.org>
To change your delivery options, retrieve your password, or
unsubscribe from this list, visit

https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=


___
cross-project-issues-dev mailing list
cross

Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-14 Thread Alexander Fedorov
This part of the process is really unclear. What is the right way to 
promote "RC2" to "R" for the particular SimRel+1week contribution?


Regards,
AF

14.06.2019 12:56, Markus Knauer пишет:

Hmm, big surprise...
I just realized, too, like so many other people that there is no RC3. 
That should have been communicated better.


The current EPP builds are really "RC2" builds and not a "R" (GA) 
build. That still needs to be done, and will take some more time.


Regards,
Markus


On Thu, 13 Jun 2019 at 18:24, Greg Watson <mailto:g.wat...@computer.org>> wrote:


I can live without it :-)

I agree with Doug though, it should probably be better documented
when the last contribution can be made. Since the iterations come
so frequently now, it’s hard to keep up with where we are in a cycle.

Regards,
Greg


On Jun 13, 2019, at 12:10 PM, Doug Schaefer
mailto:dschae...@blackberry.com>> wrote:

If that's the rule, it should really be captured here:

https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan

Also interesting that the GA date keeps getting earlier. We're in
mid-June territory now...

Doug.


From:cross-project-issues-dev-boun...@eclipse.org

<mailto:cross-project-issues-dev-boun...@eclipse.org>[cross-project-issues-dev-boun...@eclipse.org
<mailto:cross-project-issues-dev-boun...@eclipse.org>] on behalf
of Frederic Gurr [frederic.g...@eclipse-foundation.org
<mailto:frederic.g...@eclipse-foundation.org>]
Sent: Thursday, June 13, 2019 12:04 PM
To:cross-project-issues-dev@eclipse.org
    <mailto:cross-project-issues-dev@eclipse.org>
    Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release
Candidate 2 (RC2) staging repo is complete

Hi,

The quiet period officially starts tomorrow, but the EPP build is
always
on a Thursday. Unfortunately, last minute contributions have
started to
bleed into Thursday for a while now, even though they should be
done by
Wednesday EOB.

Are you okay with leaving out that change?

Regards,

Fred

On 13.06.19 17:58, Greg Watson wrote:

No, not critical, but I thought tomorrow was the start of the
RC2 quiet period?

Greg


On Jun 13, 2019, at 11:45 AM, Frederic Gurr
mailto:frederic.g...@eclipse-foundation.org>> wrote:

Hi,

Is this a critical fix?

Regards,

Fred

On 13.06.19 16:24, Greg Watson wrote:

I have an update that only went into the build today because a
previous Gerrit changeset was never validated. Is it possible
to run the aggregation again today? Sorry for the last minute
issue.

Thanks,
Greg


On Jun 13, 2019, at 9:43 AM, Frederic Gurr
mailto:frederic.g...@eclipse-foundation.org>> wrote:

Hi,

Since the SimRel aggregator build is quiet, I declare the
staging repo
for 2019-06 RC2 to be complete.

As usual, it can be found here:


=>https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=

Please note, we will enter quiet days for 2019-06. If no blocking
issues are found, RC2 will become the official 2019-06 release on
Wednesday, June 19th.

Thanks for all your contributions and happy _quiet_ days!

Regards,

Fred




--
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH

Annastr. 46, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
<mailto:cross-project-issues-dev@eclipse.org>
To change your delivery options, retrieve your password, or
unsubscribe from this list, visit

https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=


___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
<mailto:cross-project-issues-dev@eclipse.org>
To change your delivery options, retrieve your password, or
unsubscribe from this list, visit

https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2v

Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-14 Thread Markus Knauer
Hmm, big surprise...
I just realized, too, like so many other people that there is no RC3. That
should have been communicated better.

The current EPP builds are really "RC2" builds and not a "R" (GA) build.
That still needs to be done, and will take some more time.

Regards,
Markus


On Thu, 13 Jun 2019 at 18:24, Greg Watson  wrote:

> I can live without it :-)
>
> I agree with Doug though, it should probably be better documented when the
> last contribution can be made. Since the iterations come so frequently now,
> it’s hard to keep up with where we are in a cycle.
>
> Regards,
> Greg
>
> On Jun 13, 2019, at 12:10 PM, Doug Schaefer 
> wrote:
>
> If that's the rule, it should really be captured here:
>
> https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan
>
> Also interesting that the GA date keeps getting earlier. We're in mid-June
> territory now...
>
> Doug.
>
> 
> From: cross-project-issues-dev-boun...@eclipse.org [
> cross-project-issues-dev-boun...@eclipse.org] on behalf of Frederic Gurr [
> frederic.g...@eclipse-foundation.org]
> Sent: Thursday, June 13, 2019 12:04 PM
> To: cross-project-issues-dev@eclipse.org
> Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2
> (RC2) staging repo is complete
>
> Hi,
>
> The quiet period officially starts tomorrow, but the EPP build is always
> on a Thursday. Unfortunately, last minute contributions have started to
> bleed into Thursday for a while now, even though they should be done by
> Wednesday EOB.
>
> Are you okay with leaving out that change?
>
> Regards,
>
> Fred
>
> On 13.06.19 17:58, Greg Watson wrote:
>
> No, not critical, but I thought tomorrow was the start of the RC2 quiet
> period?
>
> Greg
>
> On Jun 13, 2019, at 11:45 AM, Frederic Gurr <
> frederic.g...@eclipse-foundation.org> wrote:
>
> Hi,
>
> Is this a critical fix?
>
> Regards,
>
> Fred
>
> On 13.06.19 16:24, Greg Watson wrote:
>
> I have an update that only went into the build today because a previous
> Gerrit changeset was never validated. Is it possible to run the aggregation
> again today? Sorry for the last minute issue.
>
> Thanks,
> Greg
>
> On Jun 13, 2019, at 9:43 AM, Frederic Gurr <
> frederic.g...@eclipse-foundation.org> wrote:
>
> Hi,
>
> Since the SimRel aggregator build is quiet, I declare the staging repo
> for 2019-06 RC2 to be complete.
>
> As usual, it can be found here:
>
> =>
> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=
>
> Please note, we will enter quiet days for 2019-06. If no blocking
> issues are found, RC2 will become the official 2019-06 release on
> Wednesday, June 19th.
>
> Thanks for all your contributions and happy _quiet_ days!
>
> Regards,
>
> Fred
>
>
>
> --
> Frederic Gurr
> Release Engineer | Eclipse Foundation Europe GmbH
>
> Annastr. 46, D-64673 Zwingenberg
> Handelsregister: Darmstadt HRB 92821
> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
> ___
> cross-project-issues-dev mailing list
> cross-project-issues-dev@eclipse.org
> To change your delivery options, retrieve your password, or unsubscribe
> from this list, visit
>
> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
>
>
> ___
> cross-project-issues-dev mailing list
> cross-project-issues-dev@eclipse.org
> To change your delivery options, retrieve your password, or unsubscribe
> from this list, visit
>
> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
>
>
> --
> Frederic Gurr
> Release Engineer | Eclipse Foundation Europe GmbH
>
> Annastr. 46, D-64673 Zwingenberg
> Handelsregister: Darmstadt HRB 92821
> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
> ___
> cross-project-issues-dev mailing list
> cros

Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Greg Watson
I can live without it :-)

I agree with Doug though, it should probably be better documented when the last 
contribution can be made. Since the iterations come so frequently now, it’s 
hard to keep up with where we are in a cycle.

Regards,
Greg

> On Jun 13, 2019, at 12:10 PM, Doug Schaefer  wrote:
> 
> If that's the rule, it should really be captured here:
> 
> https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan 
> <https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan>
> 
> Also interesting that the GA date keeps getting earlier. We're in mid-June 
> territory now...
> 
> Doug.
> 
> 
> From: cross-project-issues-dev-boun...@eclipse.org 
> <mailto:cross-project-issues-dev-boun...@eclipse.org> 
> [cross-project-issues-dev-boun...@eclipse.org 
> <mailto:cross-project-issues-dev-boun...@eclipse.org>] on behalf of Frederic 
> Gurr [frederic.g...@eclipse-foundation.org 
> <mailto:frederic.g...@eclipse-foundation.org>]
> Sent: Thursday, June 13, 2019 12:04 PM
> To: cross-project-issues-dev@eclipse.org 
> <mailto:cross-project-issues-dev@eclipse.org>
> Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 
> (RC2) staging repo is complete
> 
> Hi,
> 
> The quiet period officially starts tomorrow, but the EPP build is always
> on a Thursday. Unfortunately, last minute contributions have started to
> bleed into Thursday for a while now, even though they should be done by
> Wednesday EOB.
> 
> Are you okay with leaving out that change?
> 
> Regards,
> 
> Fred
> 
> On 13.06.19 17:58, Greg Watson wrote:
>> No, not critical, but I thought tomorrow was the start of the RC2 quiet 
>> period?
>> 
>> Greg
>> 
>>> On Jun 13, 2019, at 11:45 AM, Frederic Gurr 
>>>  wrote:
>>> 
>>> Hi,
>>> 
>>> Is this a critical fix?
>>> 
>>> Regards,
>>> 
>>> Fred
>>> 
>>> On 13.06.19 16:24, Greg Watson wrote:
>>>> I have an update that only went into the build today because a previous 
>>>> Gerrit changeset was never validated. Is it possible to run the 
>>>> aggregation again today? Sorry for the last minute issue.
>>>> 
>>>> Thanks,
>>>> Greg
>>>> 
>>>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
>>>>>  wrote:
>>>>> 
>>>>> Hi,
>>>>> 
>>>>> Since the SimRel aggregator build is quiet, I declare the staging repo
>>>>> for 2019-06 RC2 to be complete.
>>>>> 
>>>>> As usual, it can be found here:
>>>>> 
>>>>> => 
>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=
>>>>>  
>>>>> <https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=>
>>>>> 
>>>>> Please note, we will enter quiet days for 2019-06. If no blocking
>>>>> issues are found, RC2 will become the official 2019-06 release on
>>>>> Wednesday, June 19th.
>>>>> 
>>>>> Thanks for all your contributions and happy _quiet_ days!
>>>>> 
>>>>> Regards,
>>>>> 
>>>>> Fred
>>>>> 
>>>>> 
>>> 
>>> --
>>> Frederic Gurr
>>> Release Engineer | Eclipse Foundation Europe GmbH
>>> 
>>> Annastr. 46, D-64673 Zwingenberg
>>> Handelsregister: Darmstadt HRB 92821
>>> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
>>> ___
>>> cross-project-issues-dev mailing list
>>> cross-project-issues-dev@eclipse.org 
>>> <mailto:cross-project-issues-dev@eclipse.org>
>>> To change your delivery options, retrieve your password, or unsubscribe 
>>> from this list, visit
>>> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O4

Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Frederic Gurr
Hi,

I'll add it to the wiki.

The GA date shifted due to the new 13 week release cadence.

Regards,

Fred

On 13.06.19 18:10, Doug Schaefer wrote:
> If that's the rule, it should really be captured here:
> 
> https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan
> 
> Also interesting that the GA date keeps getting earlier. We're in mid-June 
> territory now...
> 
> Doug.
> 
> 
> From: cross-project-issues-dev-boun...@eclipse.org 
> [cross-project-issues-dev-boun...@eclipse.org] on behalf of Frederic Gurr 
> [frederic.g...@eclipse-foundation.org]
> Sent: Thursday, June 13, 2019 12:04 PM
> To: cross-project-issues-dev@eclipse.org
> Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 
> (RC2) staging repo is complete
> 
> Hi,
> 
> The quiet period officially starts tomorrow, but the EPP build is always
> on a Thursday. Unfortunately, last minute contributions have started to
> bleed into Thursday for a while now, even though they should be done by
> Wednesday EOB.
> 
> Are you okay with leaving out that change?
> 
> Regards,
> 
> Fred
> 
> On 13.06.19 17:58, Greg Watson wrote:
>> No, not critical, but I thought tomorrow was the start of the RC2 quiet 
>> period?
>>
>> Greg
>>
>>> On Jun 13, 2019, at 11:45 AM, Frederic Gurr 
>>>  wrote:
>>>
>>> Hi,
>>>
>>> Is this a critical fix?
>>>
>>> Regards,
>>>
>>> Fred
>>>
>>> On 13.06.19 16:24, Greg Watson wrote:
>>>> I have an update that only went into the build today because a previous 
>>>> Gerrit changeset was never validated. Is it possible to run the 
>>>> aggregation again today? Sorry for the last minute issue.
>>>>
>>>> Thanks,
>>>> Greg
>>>>
>>>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
>>>>>  wrote:
>>>>>
>>>>> Hi,
>>>>>
>>>>> Since the SimRel aggregator build is quiet, I declare the staging repo
>>>>> for 2019-06 RC2 to be complete.
>>>>>
>>>>> As usual, it can be found here:
>>>>>
>>>>> => 
>>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=
>>>>>
>>>>> Please note, we will enter quiet days for 2019-06. If no blocking
>>>>> issues are found, RC2 will become the official 2019-06 release on
>>>>> Wednesday, June 19th.
>>>>>
>>>>> Thanks for all your contributions and happy _quiet_ days!
>>>>>
>>>>> Regards,
>>>>>
>>>>> Fred
>>>>>
>>>>>
>>>
>>> --
>>> Frederic Gurr
>>> Release Engineer | Eclipse Foundation Europe GmbH
>>>
>>> Annastr. 46, D-64673 Zwingenberg
>>> Handelsregister: Darmstadt HRB 92821
>>> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
>>> ___
>>> cross-project-issues-dev mailing list
>>> cross-project-issues-dev@eclipse.org
>>> To change your delivery options, retrieve your password, or unsubscribe 
>>> from this list, visit
>>> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
>>
>> ___
>> cross-project-issues-dev mailing list
>> cross-project-issues-dev@eclipse.org
>> To change your delivery options, retrieve your password, or unsubscribe from 
>> this list, visit
>> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
>>
> 
> --
> Frederic Gurr
> Release Engineer | Eclipse Foundation Europe GmbH
> 
> Annastr. 46, D-64673 Zwingenberg
> Handelsregister: Darmstadt HRB 92821
> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
> 

Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Doug Schaefer
If that's the rule, it should really be captured here:

https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan

Also interesting that the GA date keeps getting earlier. We're in mid-June 
territory now...

Doug.


From: cross-project-issues-dev-boun...@eclipse.org 
[cross-project-issues-dev-boun...@eclipse.org] on behalf of Frederic Gurr 
[frederic.g...@eclipse-foundation.org]
Sent: Thursday, June 13, 2019 12:04 PM
To: cross-project-issues-dev@eclipse.org
Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 
(RC2) staging repo is complete

Hi,

The quiet period officially starts tomorrow, but the EPP build is always
on a Thursday. Unfortunately, last minute contributions have started to
bleed into Thursday for a while now, even though they should be done by
Wednesday EOB.

Are you okay with leaving out that change?

Regards,

Fred

On 13.06.19 17:58, Greg Watson wrote:
> No, not critical, but I thought tomorrow was the start of the RC2 quiet 
> period?
>
> Greg
>
>> On Jun 13, 2019, at 11:45 AM, Frederic Gurr 
>>  wrote:
>>
>> Hi,
>>
>> Is this a critical fix?
>>
>> Regards,
>>
>> Fred
>>
>> On 13.06.19 16:24, Greg Watson wrote:
>>> I have an update that only went into the build today because a previous 
>>> Gerrit changeset was never validated. Is it possible to run the aggregation 
>>> again today? Sorry for the last minute issue.
>>>
>>> Thanks,
>>> Greg
>>>
>>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
>>>>  wrote:
>>>>
>>>> Hi,
>>>>
>>>> Since the SimRel aggregator build is quiet, I declare the staging repo
>>>> for 2019-06 RC2 to be complete.
>>>>
>>>> As usual, it can be found here:
>>>>
>>>> => 
>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=
>>>>
>>>> Please note, we will enter quiet days for 2019-06. If no blocking
>>>> issues are found, RC2 will become the official 2019-06 release on
>>>> Wednesday, June 19th.
>>>>
>>>> Thanks for all your contributions and happy _quiet_ days!
>>>>
>>>> Regards,
>>>>
>>>> Fred
>>>>
>>>>
>>
>> --
>> Frederic Gurr
>> Release Engineer | Eclipse Foundation Europe GmbH
>>
>> Annastr. 46, D-64673 Zwingenberg
>> Handelsregister: Darmstadt HRB 92821
>> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
>> ___
>> cross-project-issues-dev mailing list
>> cross-project-issues-dev@eclipse.org
>> To change your delivery options, retrieve your password, or unsubscribe from 
>> this list, visit
>> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
>
> ___
> cross-project-issues-dev mailing list
> cross-project-issues-dev@eclipse.org
> To change your delivery options, retrieve your password, or unsubscribe from 
> this list, visit
> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
>

--
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH

Annastr. 46, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g=
___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev


Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Frederic Gurr
Hi,

The quiet period officially starts tomorrow, but the EPP build is always
on a Thursday. Unfortunately, last minute contributions have started to
bleed into Thursday for a while now, even though they should be done by
Wednesday EOB.

Are you okay with leaving out that change?

Regards,

Fred

On 13.06.19 17:58, Greg Watson wrote:
> No, not critical, but I thought tomorrow was the start of the RC2 quiet 
> period?
> 
> Greg
> 
>> On Jun 13, 2019, at 11:45 AM, Frederic Gurr 
>>  wrote:
>>
>> Hi,
>>
>> Is this a critical fix?
>>
>> Regards,
>>
>> Fred
>>
>> On 13.06.19 16:24, Greg Watson wrote:
>>> I have an update that only went into the build today because a previous 
>>> Gerrit changeset was never validated. Is it possible to run the aggregation 
>>> again today? Sorry for the last minute issue.
>>>
>>> Thanks,
>>> Greg
>>>
 On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
  wrote:

 Hi,

 Since the SimRel aggregator build is quiet, I declare the staging repo
 for 2019-06 RC2 to be complete.

 As usual, it can be found here:

 => http://download.eclipse.org/staging/2019-06/

 Please note, we will enter quiet days for 2019-06. If no blocking
 issues are found, RC2 will become the official 2019-06 release on
 Wednesday, June 19th.

 Thanks for all your contributions and happy _quiet_ days!

 Regards,

 Fred


>>
>> -- 
>> Frederic Gurr
>> Release Engineer | Eclipse Foundation Europe GmbH
>>
>> Annastr. 46, D-64673 Zwingenberg
>> Handelsregister: Darmstadt HRB 92821
>> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
>> ___
>> cross-project-issues-dev mailing list
>> cross-project-issues-dev@eclipse.org
>> To change your delivery options, retrieve your password, or unsubscribe from 
>> this list, visit
>> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
> 
> ___
> cross-project-issues-dev mailing list
> cross-project-issues-dev@eclipse.org
> To change your delivery options, retrieve your password, or unsubscribe from 
> this list, visit
> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
> 

-- 
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH

Annastr. 46, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev


Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Greg Watson
No, not critical, but I thought tomorrow was the start of the RC2 quiet period?

Greg

> On Jun 13, 2019, at 11:45 AM, Frederic Gurr 
>  wrote:
> 
> Hi,
> 
> Is this a critical fix?
> 
> Regards,
> 
> Fred
> 
> On 13.06.19 16:24, Greg Watson wrote:
>> I have an update that only went into the build today because a previous 
>> Gerrit changeset was never validated. Is it possible to run the aggregation 
>> again today? Sorry for the last minute issue.
>> 
>> Thanks,
>> Greg
>> 
>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
>>>  wrote:
>>> 
>>> Hi,
>>> 
>>> Since the SimRel aggregator build is quiet, I declare the staging repo
>>> for 2019-06 RC2 to be complete.
>>> 
>>> As usual, it can be found here:
>>> 
>>> => http://download.eclipse.org/staging/2019-06/
>>> 
>>> Please note, we will enter quiet days for 2019-06. If no blocking
>>> issues are found, RC2 will become the official 2019-06 release on
>>> Wednesday, June 19th.
>>> 
>>> Thanks for all your contributions and happy _quiet_ days!
>>> 
>>> Regards,
>>> 
>>> Fred
>>> 
>>> 
> 
> -- 
> Frederic Gurr
> Release Engineer | Eclipse Foundation Europe GmbH
> 
> Annastr. 46, D-64673 Zwingenberg
> Handelsregister: Darmstadt HRB 92821
> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
> ___
> cross-project-issues-dev mailing list
> cross-project-issues-dev@eclipse.org
> To change your delivery options, retrieve your password, or unsubscribe from 
> this list, visit
> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev

___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev


Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Frederic Gurr
Hi,

Is this a critical fix?

Regards,

Fred

On 13.06.19 16:24, Greg Watson wrote:
> I have an update that only went into the build today because a previous 
> Gerrit changeset was never validated. Is it possible to run the aggregation 
> again today? Sorry for the last minute issue.
> 
> Thanks,
> Greg
> 
>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
>>  wrote:
>>
>> Hi,
>>
>> Since the SimRel aggregator build is quiet, I declare the staging repo
>> for 2019-06 RC2 to be complete.
>>
>> As usual, it can be found here:
>>
>> => http://download.eclipse.org/staging/2019-06/
>>
>> Please note, we will enter quiet days for 2019-06. If no blocking
>> issues are found, RC2 will become the official 2019-06 release on
>> Wednesday, June 19th.
>>
>> Thanks for all your contributions and happy _quiet_ days!
>>
>> Regards,
>>
>> Fred
>>
>>

-- 
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH

Annastr. 46, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev


Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete

2019-06-13 Thread Greg Watson
I have an update that only went into the build today because a previous Gerrit 
changeset was never validated. Is it possible to run the aggregation again 
today? Sorry for the last minute issue.

Thanks,
Greg

> On Jun 13, 2019, at 9:43 AM, Frederic Gurr 
>  wrote:
> 
> Hi,
> 
> Since the SimRel aggregator build is quiet, I declare the staging repo
> for 2019-06 RC2 to be complete.
> 
> As usual, it can be found here:
> 
> => http://download.eclipse.org/staging/2019-06/
> 
> Please note, we will enter quiet days for 2019-06. If no blocking
> issues are found, RC2 will become the official 2019-06 release on
> Wednesday, June 19th.
> 
> Thanks for all your contributions and happy _quiet_ days!
> 
> Regards,
> 
> Fred
> 
> 
> -- 
> Frederic Gurr
> Release Engineer | Eclipse Foundation Europe GmbH
> 
> Annastr. 44, D-64673 Zwingenberg
> Handelsregister: Darmstadt HRB 92821
> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
> ___
> cross-project-issues-dev mailing list
> cross-project-issues-dev@eclipse.org
> To change your delivery options, retrieve your password, or unsubscribe from 
> this list, visit
> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev

___
cross-project-issues-dev mailing list
cross-project-issues-dev@eclipse.org
To change your delivery options, retrieve your password, or unsubscribe from 
this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev