Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
Hi AFAIAA it involves a fair amount of manual renaming. See https://wiki.eclipse.org/OCL/Dev/Releng/Quiet_Week It would be great if the PMI could be configured with the final 'non-release' artifacts, e.g. RC2, so that all the other little details like mirrors happen automatically and correctly in the true release artifacts. Regards Ed Willink On 14/06/2019 11:36, Alexander Fedorov wrote: This part of the process is really unclear. What is the right way to promote "RC2" to "R" for the particular SimRel+1week contribution? Regards, AF 14.06.2019 12:56, Markus Knauer пишет: Hmm, big surprise... I just realized, too, like so many other people that there is no RC3. That should have been communicated better. The current EPP builds are really "RC2" builds and not a "R" (GA) build. That still needs to be done, and will take some more time. Regards, Markus On Thu, 13 Jun 2019 at 18:24, Greg Watson <mailto:g.wat...@computer.org>> wrote: I can live without it :-) I agree with Doug though, it should probably be better documented when the last contribution can be made. Since the iterations come so frequently now, it’s hard to keep up with where we are in a cycle. Regards, Greg On Jun 13, 2019, at 12:10 PM, Doug Schaefer mailto:dschae...@blackberry.com>> wrote: If that's the rule, it should really be captured here: https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan Also interesting that the GA date keeps getting earlier. We're in mid-June territory now... Doug. From:cross-project-issues-dev-boun...@eclipse.org <mailto:cross-project-issues-dev-boun...@eclipse.org>[cross-project-issues-dev-boun...@eclipse.org <mailto:cross-project-issues-dev-boun...@eclipse.org>] on behalf of Frederic Gurr [frederic.g...@eclipse-foundation.org <mailto:frederic.g...@eclipse-foundation.org>] Sent: Thursday, June 13, 2019 12:04 PM To:cross-project-issues-dev@eclipse.org <mailto:cross-project-issues-dev@eclipse.org> Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete Hi, The quiet period officially starts tomorrow, but the EPP build is always on a Thursday. Unfortunately, last minute contributions have started to bleed into Thursday for a while now, even though they should be done by Wednesday EOB. Are you okay with leaving out that change? Regards, Fred On 13.06.19 17:58, Greg Watson wrote: No, not critical, but I thought tomorrow was the start of the RC2 quiet period? Greg On Jun 13, 2019, at 11:45 AM, Frederic Gurr mailto:frederic.g...@eclipse-foundation.org>> wrote: Hi, Is this a critical fix? Regards, Fred On 13.06.19 16:24, Greg Watson wrote: I have an update that only went into the build today because a previous Gerrit changeset was never validated. Is it possible to run the aggregation again today? Sorry for the last minute issue. Thanks, Greg On Jun 13, 2019, at 9:43 AM, Frederic Gurr mailto:frederic.g...@eclipse-foundation.org>> wrote: Hi, Since the SimRel aggregator build is quiet, I declare the staging repo for 2019-06 RC2 to be complete. As usual, it can be found here: =>https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M= Please note, we will enter quiet days for 2019-06. If no blocking issues are found, RC2 will become the official 2019-06 release on Wednesday, June 19th. Thanks for all your contributions and happy _quiet_ days! Regards, Fred -- Frederic Gurr Release Engineer | Eclipse Foundation Europe GmbH Annastr. 46, D-64673 Zwingenberg Handelsregister: Darmstadt HRB 92821 Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org <mailto:cross-project-issues-dev@eclipse.org> To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= ___ cross-project-issues-dev mailing list cross
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
This part of the process is really unclear. What is the right way to promote "RC2" to "R" for the particular SimRel+1week contribution? Regards, AF 14.06.2019 12:56, Markus Knauer пишет: Hmm, big surprise... I just realized, too, like so many other people that there is no RC3. That should have been communicated better. The current EPP builds are really "RC2" builds and not a "R" (GA) build. That still needs to be done, and will take some more time. Regards, Markus On Thu, 13 Jun 2019 at 18:24, Greg Watson <mailto:g.wat...@computer.org>> wrote: I can live without it :-) I agree with Doug though, it should probably be better documented when the last contribution can be made. Since the iterations come so frequently now, it’s hard to keep up with where we are in a cycle. Regards, Greg On Jun 13, 2019, at 12:10 PM, Doug Schaefer mailto:dschae...@blackberry.com>> wrote: If that's the rule, it should really be captured here: https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan Also interesting that the GA date keeps getting earlier. We're in mid-June territory now... Doug. From:cross-project-issues-dev-boun...@eclipse.org <mailto:cross-project-issues-dev-boun...@eclipse.org>[cross-project-issues-dev-boun...@eclipse.org <mailto:cross-project-issues-dev-boun...@eclipse.org>] on behalf of Frederic Gurr [frederic.g...@eclipse-foundation.org <mailto:frederic.g...@eclipse-foundation.org>] Sent: Thursday, June 13, 2019 12:04 PM To:cross-project-issues-dev@eclipse.org <mailto:cross-project-issues-dev@eclipse.org> Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete Hi, The quiet period officially starts tomorrow, but the EPP build is always on a Thursday. Unfortunately, last minute contributions have started to bleed into Thursday for a while now, even though they should be done by Wednesday EOB. Are you okay with leaving out that change? Regards, Fred On 13.06.19 17:58, Greg Watson wrote: No, not critical, but I thought tomorrow was the start of the RC2 quiet period? Greg On Jun 13, 2019, at 11:45 AM, Frederic Gurr mailto:frederic.g...@eclipse-foundation.org>> wrote: Hi, Is this a critical fix? Regards, Fred On 13.06.19 16:24, Greg Watson wrote: I have an update that only went into the build today because a previous Gerrit changeset was never validated. Is it possible to run the aggregation again today? Sorry for the last minute issue. Thanks, Greg On Jun 13, 2019, at 9:43 AM, Frederic Gurr mailto:frederic.g...@eclipse-foundation.org>> wrote: Hi, Since the SimRel aggregator build is quiet, I declare the staging repo for 2019-06 RC2 to be complete. As usual, it can be found here: =>https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M= Please note, we will enter quiet days for 2019-06. If no blocking issues are found, RC2 will become the official 2019-06 release on Wednesday, June 19th. Thanks for all your contributions and happy _quiet_ days! Regards, Fred -- Frederic Gurr Release Engineer | Eclipse Foundation Europe GmbH Annastr. 46, D-64673 Zwingenberg Handelsregister: Darmstadt HRB 92821 Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org <mailto:cross-project-issues-dev@eclipse.org> To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org <mailto:cross-project-issues-dev@eclipse.org> To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2v
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
Hmm, big surprise... I just realized, too, like so many other people that there is no RC3. That should have been communicated better. The current EPP builds are really "RC2" builds and not a "R" (GA) build. That still needs to be done, and will take some more time. Regards, Markus On Thu, 13 Jun 2019 at 18:24, Greg Watson wrote: > I can live without it :-) > > I agree with Doug though, it should probably be better documented when the > last contribution can be made. Since the iterations come so frequently now, > it’s hard to keep up with where we are in a cycle. > > Regards, > Greg > > On Jun 13, 2019, at 12:10 PM, Doug Schaefer > wrote: > > If that's the rule, it should really be captured here: > > https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan > > Also interesting that the GA date keeps getting earlier. We're in mid-June > territory now... > > Doug. > > > From: cross-project-issues-dev-boun...@eclipse.org [ > cross-project-issues-dev-boun...@eclipse.org] on behalf of Frederic Gurr [ > frederic.g...@eclipse-foundation.org] > Sent: Thursday, June 13, 2019 12:04 PM > To: cross-project-issues-dev@eclipse.org > Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 > (RC2) staging repo is complete > > Hi, > > The quiet period officially starts tomorrow, but the EPP build is always > on a Thursday. Unfortunately, last minute contributions have started to > bleed into Thursday for a while now, even though they should be done by > Wednesday EOB. > > Are you okay with leaving out that change? > > Regards, > > Fred > > On 13.06.19 17:58, Greg Watson wrote: > > No, not critical, but I thought tomorrow was the start of the RC2 quiet > period? > > Greg > > On Jun 13, 2019, at 11:45 AM, Frederic Gurr < > frederic.g...@eclipse-foundation.org> wrote: > > Hi, > > Is this a critical fix? > > Regards, > > Fred > > On 13.06.19 16:24, Greg Watson wrote: > > I have an update that only went into the build today because a previous > Gerrit changeset was never validated. Is it possible to run the aggregation > again today? Sorry for the last minute issue. > > Thanks, > Greg > > On Jun 13, 2019, at 9:43 AM, Frederic Gurr < > frederic.g...@eclipse-foundation.org> wrote: > > Hi, > > Since the SimRel aggregator build is quiet, I declare the staging repo > for 2019-06 RC2 to be complete. > > As usual, it can be found here: > > => > https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M= > > Please note, we will enter quiet days for 2019-06. If no blocking > issues are found, RC2 will become the official 2019-06 release on > Wednesday, June 19th. > > Thanks for all your contributions and happy _quiet_ days! > > Regards, > > Fred > > > > -- > Frederic Gurr > Release Engineer | Eclipse Foundation Europe GmbH > > Annastr. 46, D-64673 Zwingenberg > Handelsregister: Darmstadt HRB 92821 > Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque > ___ > cross-project-issues-dev mailing list > cross-project-issues-dev@eclipse.org > To change your delivery options, retrieve your password, or unsubscribe > from this list, visit > > https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= > > > ___ > cross-project-issues-dev mailing list > cross-project-issues-dev@eclipse.org > To change your delivery options, retrieve your password, or unsubscribe > from this list, visit > > https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= > > > -- > Frederic Gurr > Release Engineer | Eclipse Foundation Europe GmbH > > Annastr. 46, D-64673 Zwingenberg > Handelsregister: Darmstadt HRB 92821 > Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque > ___ > cross-project-issues-dev mailing list > cros
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
I can live without it :-) I agree with Doug though, it should probably be better documented when the last contribution can be made. Since the iterations come so frequently now, it’s hard to keep up with where we are in a cycle. Regards, Greg > On Jun 13, 2019, at 12:10 PM, Doug Schaefer wrote: > > If that's the rule, it should really be captured here: > > https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan > <https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan> > > Also interesting that the GA date keeps getting earlier. We're in mid-June > territory now... > > Doug. > > > From: cross-project-issues-dev-boun...@eclipse.org > <mailto:cross-project-issues-dev-boun...@eclipse.org> > [cross-project-issues-dev-boun...@eclipse.org > <mailto:cross-project-issues-dev-boun...@eclipse.org>] on behalf of Frederic > Gurr [frederic.g...@eclipse-foundation.org > <mailto:frederic.g...@eclipse-foundation.org>] > Sent: Thursday, June 13, 2019 12:04 PM > To: cross-project-issues-dev@eclipse.org > <mailto:cross-project-issues-dev@eclipse.org> > Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 > (RC2) staging repo is complete > > Hi, > > The quiet period officially starts tomorrow, but the EPP build is always > on a Thursday. Unfortunately, last minute contributions have started to > bleed into Thursday for a while now, even though they should be done by > Wednesday EOB. > > Are you okay with leaving out that change? > > Regards, > > Fred > > On 13.06.19 17:58, Greg Watson wrote: >> No, not critical, but I thought tomorrow was the start of the RC2 quiet >> period? >> >> Greg >> >>> On Jun 13, 2019, at 11:45 AM, Frederic Gurr >>> wrote: >>> >>> Hi, >>> >>> Is this a critical fix? >>> >>> Regards, >>> >>> Fred >>> >>> On 13.06.19 16:24, Greg Watson wrote: >>>> I have an update that only went into the build today because a previous >>>> Gerrit changeset was never validated. Is it possible to run the >>>> aggregation again today? Sorry for the last minute issue. >>>> >>>> Thanks, >>>> Greg >>>> >>>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr >>>>> wrote: >>>>> >>>>> Hi, >>>>> >>>>> Since the SimRel aggregator build is quiet, I declare the staging repo >>>>> for 2019-06 RC2 to be complete. >>>>> >>>>> As usual, it can be found here: >>>>> >>>>> => >>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M= >>>>> >>>>> <https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M=> >>>>> >>>>> Please note, we will enter quiet days for 2019-06. If no blocking >>>>> issues are found, RC2 will become the official 2019-06 release on >>>>> Wednesday, June 19th. >>>>> >>>>> Thanks for all your contributions and happy _quiet_ days! >>>>> >>>>> Regards, >>>>> >>>>> Fred >>>>> >>>>> >>> >>> -- >>> Frederic Gurr >>> Release Engineer | Eclipse Foundation Europe GmbH >>> >>> Annastr. 46, D-64673 Zwingenberg >>> Handelsregister: Darmstadt HRB 92821 >>> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque >>> ___ >>> cross-project-issues-dev mailing list >>> cross-project-issues-dev@eclipse.org >>> <mailto:cross-project-issues-dev@eclipse.org> >>> To change your delivery options, retrieve your password, or unsubscribe >>> from this list, visit >>> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O4
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
Hi, I'll add it to the wiki. The GA date shifted due to the new 13 week release cadence. Regards, Fred On 13.06.19 18:10, Doug Schaefer wrote: > If that's the rule, it should really be captured here: > > https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan > > Also interesting that the GA date keeps getting earlier. We're in mid-June > territory now... > > Doug. > > > From: cross-project-issues-dev-boun...@eclipse.org > [cross-project-issues-dev-boun...@eclipse.org] on behalf of Frederic Gurr > [frederic.g...@eclipse-foundation.org] > Sent: Thursday, June 13, 2019 12:04 PM > To: cross-project-issues-dev@eclipse.org > Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 > (RC2) staging repo is complete > > Hi, > > The quiet period officially starts tomorrow, but the EPP build is always > on a Thursday. Unfortunately, last minute contributions have started to > bleed into Thursday for a while now, even though they should be done by > Wednesday EOB. > > Are you okay with leaving out that change? > > Regards, > > Fred > > On 13.06.19 17:58, Greg Watson wrote: >> No, not critical, but I thought tomorrow was the start of the RC2 quiet >> period? >> >> Greg >> >>> On Jun 13, 2019, at 11:45 AM, Frederic Gurr >>> wrote: >>> >>> Hi, >>> >>> Is this a critical fix? >>> >>> Regards, >>> >>> Fred >>> >>> On 13.06.19 16:24, Greg Watson wrote: >>>> I have an update that only went into the build today because a previous >>>> Gerrit changeset was never validated. Is it possible to run the >>>> aggregation again today? Sorry for the last minute issue. >>>> >>>> Thanks, >>>> Greg >>>> >>>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr >>>>> wrote: >>>>> >>>>> Hi, >>>>> >>>>> Since the SimRel aggregator build is quiet, I declare the staging repo >>>>> for 2019-06 RC2 to be complete. >>>>> >>>>> As usual, it can be found here: >>>>> >>>>> => >>>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M= >>>>> >>>>> Please note, we will enter quiet days for 2019-06. If no blocking >>>>> issues are found, RC2 will become the official 2019-06 release on >>>>> Wednesday, June 19th. >>>>> >>>>> Thanks for all your contributions and happy _quiet_ days! >>>>> >>>>> Regards, >>>>> >>>>> Fred >>>>> >>>>> >>> >>> -- >>> Frederic Gurr >>> Release Engineer | Eclipse Foundation Europe GmbH >>> >>> Annastr. 46, D-64673 Zwingenberg >>> Handelsregister: Darmstadt HRB 92821 >>> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque >>> ___ >>> cross-project-issues-dev mailing list >>> cross-project-issues-dev@eclipse.org >>> To change your delivery options, retrieve your password, or unsubscribe >>> from this list, visit >>> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= >> >> ___ >> cross-project-issues-dev mailing list >> cross-project-issues-dev@eclipse.org >> To change your delivery options, retrieve your password, or unsubscribe from >> this list, visit >> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= >> > > -- > Frederic Gurr > Release Engineer | Eclipse Foundation Europe GmbH > > Annastr. 46, D-64673 Zwingenberg > Handelsregister: Darmstadt HRB 92821 > Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque >
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
If that's the rule, it should really be captured here: https://wiki.eclipse.org/SimRel/2019-06/Simultaneous_Release_Plan Also interesting that the GA date keeps getting earlier. We're in mid-June territory now... Doug. From: cross-project-issues-dev-boun...@eclipse.org [cross-project-issues-dev-boun...@eclipse.org] on behalf of Frederic Gurr [frederic.g...@eclipse-foundation.org] Sent: Thursday, June 13, 2019 12:04 PM To: cross-project-issues-dev@eclipse.org Subject: Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete Hi, The quiet period officially starts tomorrow, but the EPP build is always on a Thursday. Unfortunately, last minute contributions have started to bleed into Thursday for a while now, even though they should be done by Wednesday EOB. Are you okay with leaving out that change? Regards, Fred On 13.06.19 17:58, Greg Watson wrote: > No, not critical, but I thought tomorrow was the start of the RC2 quiet > period? > > Greg > >> On Jun 13, 2019, at 11:45 AM, Frederic Gurr >> wrote: >> >> Hi, >> >> Is this a critical fix? >> >> Regards, >> >> Fred >> >> On 13.06.19 16:24, Greg Watson wrote: >>> I have an update that only went into the build today because a previous >>> Gerrit changeset was never validated. Is it possible to run the aggregation >>> again today? Sorry for the last minute issue. >>> >>> Thanks, >>> Greg >>> >>>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr >>>> wrote: >>>> >>>> Hi, >>>> >>>> Since the SimRel aggregator build is quiet, I declare the staging repo >>>> for 2019-06 RC2 to be complete. >>>> >>>> As usual, it can be found here: >>>> >>>> => >>>> https://urldefense.proofpoint.com/v2/url?u=http-3A__download.eclipse.org_staging_2019-2D06_=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=yyVFt7Kg-duKjZ89Yo9TCo-e3CcfHTVh4J9mMbNFX0M= >>>> >>>> Please note, we will enter quiet days for 2019-06. If no blocking >>>> issues are found, RC2 will become the official 2019-06 release on >>>> Wednesday, June 19th. >>>> >>>> Thanks for all your contributions and happy _quiet_ days! >>>> >>>> Regards, >>>> >>>> Fred >>>> >>>> >> >> -- >> Frederic Gurr >> Release Engineer | Eclipse Foundation Europe GmbH >> >> Annastr. 46, D-64673 Zwingenberg >> Handelsregister: Darmstadt HRB 92821 >> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque >> ___ >> cross-project-issues-dev mailing list >> cross-project-issues-dev@eclipse.org >> To change your delivery options, retrieve your password, or unsubscribe from >> this list, visit >> https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= > > ___ > cross-project-issues-dev mailing list > cross-project-issues-dev@eclipse.org > To change your delivery options, retrieve your password, or unsubscribe from > this list, visit > https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= > -- Frederic Gurr Release Engineer | Eclipse Foundation Europe GmbH Annastr. 46, D-64673 Zwingenberg Handelsregister: Darmstadt HRB 92821 Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://urldefense.proofpoint.com/v2/url?u=https-3A__www.eclipse.org_mailman_listinfo_cross-2Dproject-2Dissues-2Ddev=DwICAg=yzoHOc_ZK-sxl-kfGNSEvlJYanssXN3q-lhj0sp26wE=NrrbvTHWa2Nbp_kAN0Hl1o3lM1WAwSes64uBjxjNhMc=Kxo5hO9B2vR-RsF79RhPB4XXe9-ohDFoJvX3O40qggU=Ys6M874QOeeDzWafEyaZs0kC6STit_ELSN-vnRBUS1g= ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
Hi, The quiet period officially starts tomorrow, but the EPP build is always on a Thursday. Unfortunately, last minute contributions have started to bleed into Thursday for a while now, even though they should be done by Wednesday EOB. Are you okay with leaving out that change? Regards, Fred On 13.06.19 17:58, Greg Watson wrote: > No, not critical, but I thought tomorrow was the start of the RC2 quiet > period? > > Greg > >> On Jun 13, 2019, at 11:45 AM, Frederic Gurr >> wrote: >> >> Hi, >> >> Is this a critical fix? >> >> Regards, >> >> Fred >> >> On 13.06.19 16:24, Greg Watson wrote: >>> I have an update that only went into the build today because a previous >>> Gerrit changeset was never validated. Is it possible to run the aggregation >>> again today? Sorry for the last minute issue. >>> >>> Thanks, >>> Greg >>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr wrote: Hi, Since the SimRel aggregator build is quiet, I declare the staging repo for 2019-06 RC2 to be complete. As usual, it can be found here: => http://download.eclipse.org/staging/2019-06/ Please note, we will enter quiet days for 2019-06. If no blocking issues are found, RC2 will become the official 2019-06 release on Wednesday, June 19th. Thanks for all your contributions and happy _quiet_ days! Regards, Fred >> >> -- >> Frederic Gurr >> Release Engineer | Eclipse Foundation Europe GmbH >> >> Annastr. 46, D-64673 Zwingenberg >> Handelsregister: Darmstadt HRB 92821 >> Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque >> ___ >> cross-project-issues-dev mailing list >> cross-project-issues-dev@eclipse.org >> To change your delivery options, retrieve your password, or unsubscribe from >> this list, visit >> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev > > ___ > cross-project-issues-dev mailing list > cross-project-issues-dev@eclipse.org > To change your delivery options, retrieve your password, or unsubscribe from > this list, visit > https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev > -- Frederic Gurr Release Engineer | Eclipse Foundation Europe GmbH Annastr. 46, D-64673 Zwingenberg Handelsregister: Darmstadt HRB 92821 Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
No, not critical, but I thought tomorrow was the start of the RC2 quiet period? Greg > On Jun 13, 2019, at 11:45 AM, Frederic Gurr > wrote: > > Hi, > > Is this a critical fix? > > Regards, > > Fred > > On 13.06.19 16:24, Greg Watson wrote: >> I have an update that only went into the build today because a previous >> Gerrit changeset was never validated. Is it possible to run the aggregation >> again today? Sorry for the last minute issue. >> >> Thanks, >> Greg >> >>> On Jun 13, 2019, at 9:43 AM, Frederic Gurr >>> wrote: >>> >>> Hi, >>> >>> Since the SimRel aggregator build is quiet, I declare the staging repo >>> for 2019-06 RC2 to be complete. >>> >>> As usual, it can be found here: >>> >>> => http://download.eclipse.org/staging/2019-06/ >>> >>> Please note, we will enter quiet days for 2019-06. If no blocking >>> issues are found, RC2 will become the official 2019-06 release on >>> Wednesday, June 19th. >>> >>> Thanks for all your contributions and happy _quiet_ days! >>> >>> Regards, >>> >>> Fred >>> >>> > > -- > Frederic Gurr > Release Engineer | Eclipse Foundation Europe GmbH > > Annastr. 46, D-64673 Zwingenberg > Handelsregister: Darmstadt HRB 92821 > Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque > ___ > cross-project-issues-dev mailing list > cross-project-issues-dev@eclipse.org > To change your delivery options, retrieve your password, or unsubscribe from > this list, visit > https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
Hi, Is this a critical fix? Regards, Fred On 13.06.19 16:24, Greg Watson wrote: > I have an update that only went into the build today because a previous > Gerrit changeset was never validated. Is it possible to run the aggregation > again today? Sorry for the last minute issue. > > Thanks, > Greg > >> On Jun 13, 2019, at 9:43 AM, Frederic Gurr >> wrote: >> >> Hi, >> >> Since the SimRel aggregator build is quiet, I declare the staging repo >> for 2019-06 RC2 to be complete. >> >> As usual, it can be found here: >> >> => http://download.eclipse.org/staging/2019-06/ >> >> Please note, we will enter quiet days for 2019-06. If no blocking >> issues are found, RC2 will become the official 2019-06 release on >> Wednesday, June 19th. >> >> Thanks for all your contributions and happy _quiet_ days! >> >> Regards, >> >> Fred >> >> -- Frederic Gurr Release Engineer | Eclipse Foundation Europe GmbH Annastr. 46, D-64673 Zwingenberg Handelsregister: Darmstadt HRB 92821 Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
Re: [cross-project-issues-dev] SimRel 2019-06 Release Candidate 2 (RC2) staging repo is complete
I have an update that only went into the build today because a previous Gerrit changeset was never validated. Is it possible to run the aggregation again today? Sorry for the last minute issue. Thanks, Greg > On Jun 13, 2019, at 9:43 AM, Frederic Gurr > wrote: > > Hi, > > Since the SimRel aggregator build is quiet, I declare the staging repo > for 2019-06 RC2 to be complete. > > As usual, it can be found here: > > => http://download.eclipse.org/staging/2019-06/ > > Please note, we will enter quiet days for 2019-06. If no blocking > issues are found, RC2 will become the official 2019-06 release on > Wednesday, June 19th. > > Thanks for all your contributions and happy _quiet_ days! > > Regards, > > Fred > > > -- > Frederic Gurr > Release Engineer | Eclipse Foundation Europe GmbH > > Annastr. 44, D-64673 Zwingenberg > Handelsregister: Darmstadt HRB 92821 > Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque > ___ > cross-project-issues-dev mailing list > cross-project-issues-dev@eclipse.org > To change your delivery options, retrieve your password, or unsubscribe from > this list, visit > https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev ___ cross-project-issues-dev mailing list cross-project-issues-dev@eclipse.org To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev