Re: 8.1 (and maybe 7.9) planning

2015-05-25 Thread Joerg Jaspert
On 13951 March 1977, Adam D. Barratt wrote:
>> > Based on received responses and the current date, I'm proposing June 6th
>> > for 8.1 (and then looking at other dates for 7.9). Does that still work
>> > for people?
>> Sounds ok to me. Start at 10 UTC or earlier/later?
> I was assuming either 8ish UTC (skipping dinstall) or 10ish UTC (after
> dinstall). Either would work for me, I'll just need more coffee for the
> former. :-)

I've put 12 to 14 (so 10 to 12 UTC) in my calendar.

-- 
bye, Joerg
I think Smithers picked me because of my motivational skills. Everyone
says they have to work a lot harder when I'm around.


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/87egm4n7zl@gkar.ganneff.de



Re: 8.1 (and maybe 7.9) planning

2015-05-24 Thread Adam D. Barratt
On Thu, 2015-05-21 at 09:56 +0200, Joerg Jaspert wrote:
> On 13947 March 1977, Adam D. Barratt wrote:
> >> > As seems to have become the norm, now that Jessie's out it's time to
> >> > start planning for the first point release.
> >> > We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
> >> > really wants to take place after 8.1, as we have some packages for 
> >> > which pu > opu > stable.
> > Based on received responses and the current date, I'm proposing June 6th
> > for 8.1 (and then looking at other dates for 7.9). Does that still work
> > for people?
> 
> Sounds ok to me. Start at 10 UTC or earlier/later?

I was assuming either 8ish UTC (skipping dinstall) or 10ish UTC (after
dinstall). Either would work for me, I'll just need more coffee for the
former. :-)

Regards,

Adam


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/1432482871.1640.21.ca...@adam-barratt.org.uk



Re: 8.1 (and maybe 7.9) planning

2015-05-24 Thread Paul Wise
On Sat, 2015-05-23 at 16:27 +0100, Adam D. Barratt wrote:
> press@ - ping? :-)
...
> > Based on received responses and the current date, I'm proposing June 6th
> > for 8.1 (and then looking at other dates for 7.9). Does that still work
> > for people?

I can be available as a backup for Neil if needed.

-- 
bye,
pabs

https://wiki.debian.org/PaulWise



signature.asc
Description: This is a digitally signed message part


Re: 8.1 (and maybe 7.9) planning

2015-05-23 Thread Adam D. Barratt
press@ - ping? :-)

On Wed, 2015-05-20 at 21:22 +0100, Adam D. Barratt wrote:
> On Fri, 2015-05-01 at 11:17 +0100, Adam D. Barratt wrote:
> > [Added some missed CCs; sigh]
> > 
> > On 2015-04-30 22:16, Adam D. Barratt wrote:
> > > Hi,
> > > 
> > > As seems to have become the norm, now that Jessie's out it's time to
> > > start planning for the first point release.
> > > 
> > > We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
> > > really wants to take place after 8.1, as we have some packages for 
> > > which pu > opu > stable.
> 
> Based on received responses and the current date, I'm proposing June 6th
> for 8.1 (and then looking at other dates for 7.9). Does that still work
> for people?
> 
> Regards,
> 
> Adam


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/1432394876.30889.24.ca...@adam-barratt.org.uk



Re: 8.1 (and maybe 7.9) planning

2015-05-21 Thread Joerg Jaspert
On 13947 March 1977, Adam D. Barratt wrote:
>> > As seems to have become the norm, now that Jessie's out it's time to
>> > start planning for the first point release.
>> > We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
>> > really wants to take place after 8.1, as we have some packages for 
>> > which pu > opu > stable.
> Based on received responses and the current date, I'm proposing June 6th
> for 8.1 (and then looking at other dates for 7.9). Does that still work
> for people?

Sounds ok to me. Start at 10 UTC or earlier/later?

-- 
bye, Joerg


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/87vbfmz7lk@delenn.ganneff.de



Re: 8.1 (and maybe 7.9) planning

2015-05-21 Thread Steve McIntyre
On Wed, May 20, 2015 at 09:22:44PM +0100, Adam Barratt wrote:
>On Fri, 2015-05-01 at 11:17 +0100, Adam D. Barratt wrote:
>> [Added some missed CCs; sigh]
>> 
>> On 2015-04-30 22:16, Adam D. Barratt wrote:
>> > Hi,
>> > 
>> > As seems to have become the norm, now that Jessie's out it's time to
>> > start planning for the first point release.
>> > 
>> > We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
>> > really wants to take place after 8.1, as we have some packages for 
>> > which pu > opu > stable.
>
>Based on received responses and the current date, I'm proposing June 6th
>for 8.1 (and then looking at other dates for 7.9). Does that still work
>for people?

Works for me, yes.

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
"This dress doesn't reverse." -- Alden Spiess


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/20150521082137.gw4...@einval.com



Re: 8.1 (and maybe 7.9) planning

2015-05-20 Thread Cyril Brulebois
Adam D. Barratt  (2015-05-20):
> Based on received responses and the current date, I'm proposing June 6th
> for 8.1 (and then looking at other dates for 7.9). Does that still work
> for people?

Provided the p-u freeze happens on time so that I can perform d-i tests ahead
of the release, that's fine with me; thanks.

Mraw,
KiBi.


signature.asc
Description: Digital signature


Re: 8.1 (and maybe 7.9) planning

2015-05-20 Thread Adam D. Barratt
On Fri, 2015-05-01 at 11:17 +0100, Adam D. Barratt wrote:
> [Added some missed CCs; sigh]
> 
> On 2015-04-30 22:16, Adam D. Barratt wrote:
> > Hi,
> > 
> > As seems to have become the norm, now that Jessie's out it's time to
> > start planning for the first point release.
> > 
> > We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
> > really wants to take place after 8.1, as we have some packages for 
> > which pu > opu > stable.

Based on received responses and the current date, I'm proposing June 6th
for 8.1 (and then looking at other dates for 7.9). Does that still work
for people?

Regards,

Adam


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/1432153364.3938.14.ca...@adam-barratt.org.uk



Re: 8.1 (and maybe 7.9) planning

2015-05-01 Thread Steve McIntyre
On Thu, Apr 30, 2015 at 10:16:23PM +0100, Adam Barratt wrote:
>Hi,
>
>As seems to have become the norm, now that Jessie's out it's time to
>start planning for the first point release.
>
>We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
>really wants to take place after 8.1, as we have some packages for which
>pu > opu > stable.
>
>Suggested dates (all of which appear to be okay for me currently):
>
>May 23/24

Not good for me - already have big plans that weekend.

>May 30/31 
>June 6/7
>June 13/14

All OK.

>June 20/21

Definitely not for me - on VAC abroad that weekend.

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
You raise the blade, you make the change... You re-arrange me 'til I'm sane...


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/20150502000235.gu21...@einval.com



Re: 8.1 (and maybe 7.9) planning

2015-05-01 Thread Joerg Jaspert
On 13927 March 1977, Adam D. Barratt wrote:

> We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
> really wants to take place after 8.1, as we have some packages for which
> pu > opu > stable.

> May 23/24

Works

> May 30/31 

Works

> June 6/7

Works.

> June 13/14

Nope.

> June 20/21

Should work.

-- 
bye, Joerg
(23:02)  I should take a photograph of my stapler, the maker of which is 
"RAPESCO"


-- 
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: https://lists.debian.org/87sibgarz6@gkar.ganneff.de



Re: 8.1 (and maybe 7.9) planning

2015-05-01 Thread Stefan Lippers-Hollmann
Hi

On 2015-05-01, Cyril Brulebois wrote:
[...]
>  - I see gnutls28, linux, and wpa in pu; some testing couldn't hurt.

wpa should be safe (famous last words), as it contains only the one-line
security fix for CVE-2015-1863[1], which applies to a code path/ file not
used by the udeb (as CONFIG_P2P is disabled there); the same goes for 
wheezy (where CONFIG_P2P is disabled alltogether). I've been testing all
three versions (sid, jessie-security and wheezy-security) successfully in
a non-udeb context - d-i is different of course and needs special 
testing, please let me know if there are any issues with the uploads.

Regards
Stefan Lippers-Hollmann

[1] https://security-tracker.debian.org/tracker/DSA-3233-1
http://w1.fi/security/2015-1/


pgpB_dLl4V8ca.pgp
Description: Digitale Signatur von OpenPGP


Re: 8.1 (and maybe 7.9) planning

2015-05-01 Thread Adam D. Barratt

[Added some missed CCs; sigh]

On 2015-04-30 22:16, Adam D. Barratt wrote:

Hi,

As seems to have become the norm, now that Jessie's out it's time to
start planning for the first point release.

We're also a little overdue for 7.9 as Jessie work took precedence; 7.9
really wants to take place after 8.1, as we have some packages for 
which

pu > opu > stable.

Suggested dates (all of which appear to be okay for me currently):

May 23/24
May 30/31
June 6/7
June 13/14
June 20/21

Cheers,

Adam



--
To UNSUBSCRIBE, email to debian-release-requ...@lists.debian.org
with a subject of "unsubscribe". Trouble? Contact listmas...@lists.debian.org
Archive: 
https://lists.debian.org/0a70a4f9f4ea661be0e082441c776...@mowgli.jungle.funky-badger.org



Re: 8.1 (and maybe 7.9) planning

2015-05-01 Thread Neil McGovern
On Fri, May 01, 2015 at 12:08:59PM +0200, Cyril Brulebois wrote:
> > May 23/24
> 
> Offline-ish on May 23.
> 

Same for me.

> > May 30/31
> 
> OK.
> 

OK

> > June 6/7
> 
> Offline on June 6, offline-ish on June 7.
> 

OK

> > June 13/14
> 
> Offline-ish on June 13.
> 

OK

> > June 20/21
> 
> OK.
> 

Offline-ish both these days.

Neil
-- 


signature.asc
Description: Digital signature


Re: 8.1 (and maybe 7.9) planning

2015-05-01 Thread Cyril Brulebois
(cc+=boot)

Adam D. Barratt  (2015-04-30):
> As seems to have become the norm, now that Jessie's out it's time to
> start planning for the first point release.

AFAICT there haven't been too many reports of d-i being badly broken, so
there's not much to be fixed. Here's a quick brain dump for jessie:
 - win32-loader is in the pu pipes already.
 - we might want to have hw-detect as well because acpi and friends,
   even if there's some discussion still taking place in #783247 after
   an upload to unstable.
 - it'd be nice to have a tasksel fix to allow gnome && xfce to be
   coinstalled (foo → foo | bar in depends for a single package), even
   though the fix isn't in unstable yet.
 - I see gnutls28, linux, and wpa in pu; some testing couldn't hurt.

What am I forgetting about?

(I had noted down to maybe look into #781439 and #744865 but that hasn't
happened yet.)

> We're also a little overdue for 7.9 as Jessie work took precedence;
> 7.9 really wants to take place after 8.1, as we have some packages for
> which pu > opu > stable.

Besides the debootstrap pu for wheezy (already in the pipes), I don't
think I've got anything planned for wheezy.

> Suggested dates (all of which appear to be okay for me currently):

Keeping in mind testing d-i against stuff that's in pu (notably linux)
should probably happen ahead of the release dates, let's see how much
I'm available for the said dates…

> May 23/24

Offline-ish on May 23.

> May 30/31

OK.

> June 6/7

Offline on June 6, offline-ish on June 7.

> June 13/14

Offline-ish on June 13.

> June 20/21

OK.

Mraw,
KiBi.


signature.asc
Description: Digital signature