Re: Scheduling 9.8 (was: Re: Scheduling 9.7)

2019-01-31 Thread Julien Cristau
On 1/28/19 8:45 PM, Adam D. Barratt wrote:
> On Fri, 2019-01-18 at 18:44 +, Jonathan Wiltshire wrote:
>> 9.7 is a bit overdue already (current events being a bit of a time-
>> sink).
>>
>> Please indicate your availablility out of:
>>
>>  - (Feb 2 unlikely, FOSDEM)
>>  - Feb 9
>>  - Feb 16
> 
> As we had a short-notice 9.7, this is now planning for 9.8.
> 
> Either the 9th or 16th looks like it should work for me, with a
> preference for the latter.
> 
9th or 16th should be ok for me.

Cheers,
Julien



Re: Scheduling 9.8 (was: Re: Scheduling 9.7)

2019-01-28 Thread Adam D. Barratt
On Fri, 2019-01-18 at 18:44 +, Jonathan Wiltshire wrote:
> 9.7 is a bit overdue already (current events being a bit of a time-
> sink).
> 
> Please indicate your availablility out of:
> 
>  - (Feb 2 unlikely, FOSDEM)
>  - Feb 9
>  - Feb 16

As we had a short-notice 9.7, this is now planning for 9.8.

Either the 9th or 16th looks like it should work for me, with a
preference for the latter.

Adam



Re: Scheduling 9.7

2019-01-19 Thread Cyril Brulebois
Hi,

Jonathan Wiltshire  (2019-01-18):
> Please indicate your availablility out of:
> 
>  - (Feb 2 unlikely, FOSDEM)
>  - Feb 9
>  - Feb 16

I should be able to make anything work regarding d-i preparations/checks
before the point release, thanks.


Cheers,
-- 
Cyril Brulebois (k...@debian.org)
D-I release manager -- Release team member -- Freelance Consultant


signature.asc
Description: PGP signature


Re: Scheduling 9.7

2019-01-19 Thread Donald Norwood


On 1/19/19 5:28 AM, Steve McIntyre wrote:
> On Fri, Jan 18, 2019 at 06:44:56PM +, Jonathan Wiltshire wrote:
>> Hi,
>>
>> 9.7 is a bit overdue already (current events being a bit of a time-sink).
>>
>> Please indicate your availablility out of:
>>
>> - (Feb 2 unlikely, FOSDEM)
> 
> Quite.
> 
>> - Feb 9
>> - Feb 16
> 
> Both of those currently look free for me.
> 

Press can do either the 9th or the 16th, however, we do prefer the 16th. :)


-- 
--
⢀⣴⠾⠻⢶⣦⠀
⣾⠁⢠⠒⠀⣿⡁ Donald Norwood
⢿⡄⠘⠷⠚⠋⠀ B7A1 5F45 5B28 7F38 4174
⠈⠳⣄ D5E9 E5EC 4AC9 BD62 7B05



signature.asc
Description: OpenPGP digital signature


Re: Scheduling 9.7

2019-01-19 Thread Joerg Jaspert

On 15286 March 1977, Jonathan Wiltshire wrote:


 - Feb 9
 - Feb 16


Can deal with both.

--
bye, Joerg



Re: Scheduling 9.7

2019-01-19 Thread Steve McIntyre
On Fri, Jan 18, 2019 at 06:44:56PM +, Jonathan Wiltshire wrote:
>Hi,
>
>9.7 is a bit overdue already (current events being a bit of a time-sink).
>
>Please indicate your availablility out of:
>
> - (Feb 2 unlikely, FOSDEM)

Quite.

> - Feb 9
> - Feb 16

Both of those currently look free for me.

-- 
Steve McIntyre, Cambridge, UK.st...@einval.com
"Further comment on how I feel about IBM will appear once I've worked out
 whether they're being malicious or incompetent. Capital letters are forecast."
 Matthew Garrett, http://www.livejournal.com/users/mjg59/30675.html