Re: build/devops
A full build incl. tests takes on my machine about 40 to 50 mins (if all dependencies are locally cached). Locally, I only run tests on the modules that I modified as Chesnay said. 2018-02-08 8:05 GMT+01:00 Chesnay Schepler: > Generally we run the full test suite on travis for every pull request. I > would guess that dev working on some part > only run certain tests locally though. > > > On 08.02.2018 01:06, cw7k wrote: > >> Hi, a full mvn install takes about 2-2.5 hours. Does the Flink team run >> the full testsuite on every dev pull request, or use a main dev branch that >> gets the full test periodically? Or a different method? The 2 hours can >> be a drag when one team needs another's changes and each attempt at passing >> requires a wait of 2+ hours. >> > > >
Re: build/devops
Generally we run the full test suite on travis for every pull request. I would guess that dev working on some part only run certain tests locally though. On 08.02.2018 01:06, cw7k wrote: Hi, a full mvn install takes about 2-2.5 hours. Does the Flink team run the full testsuite on every dev pull request, or use a main dev branch that gets the full test periodically? Or a different method? The 2 hours can be a drag when one team needs another's changes and each attempt at passing requires a wait of 2+ hours.
build/devops
Hi, a full mvn install takes about 2-2.5 hours. Does the Flink team run the full testsuite on every dev pull request, or use a main dev branch that gets the full test periodically? Or a different method? The 2 hours can be a drag when one team needs another's changes and each attempt at passing requires a wait of 2+ hours.