Re: Maximum number of concurrent jobs for gerrit-verify-dryrun-external

2018-06-11 Thread Jim Apple
Lgtm

On Mon, Jun 11, 2018 at 7:58 PM Lars Volker  wrote:

> Hi All,
>
> It seems that we intend to have two parallel jobs at most:
>
>- Maximum Total Concurrent Builds: 2
>- Maximum Concurrent Builds Per Node: 1
>
> However, all jobs run on master and then spawn subsequent jobs on worker
> nodes. This limits the maximum number of concurrent jobs to 1.
>
> If no-one objects, I will change this number to two concurrent jobs.
>
> Cheers, Lars
>


Maximum number of concurrent jobs for gerrit-verify-dryrun-external

2018-06-11 Thread Lars Volker
Hi All,

It seems that we intend to have two parallel jobs at most:

   - Maximum Total Concurrent Builds: 2
   - Maximum Concurrent Builds Per Node: 1

However, all jobs run on master and then spawn subsequent jobs on worker
nodes. This limits the maximum number of concurrent jobs to 1.

If no-one objects, I will change this number to two concurrent jobs.

Cheers, Lars