Re: Maximum number of concurrent jobs for gerrit-verify-dryrun-external
Lgtm On Mon, Jun 11, 2018 at 7:58 PM Lars Volker wrote: > Hi All, > > It seems that we intend to have two parallel jobs at most: > >- Maximum Total Concurrent Builds: 2 >- Maximum Concurrent Builds Per Node: 1 > > However, all jobs run on master and then spawn subsequent jobs on worker > nodes. This limits the maximum number of concurrent jobs to 1. > > If no-one objects, I will change this number to two concurrent jobs. > > Cheers, Lars >
Maximum number of concurrent jobs for gerrit-verify-dryrun-external
Hi All, It seems that we intend to have two parallel jobs at most: - Maximum Total Concurrent Builds: 2 - Maximum Concurrent Builds Per Node: 1 However, all jobs run on master and then spawn subsequent jobs on worker nodes. This limits the maximum number of concurrent jobs to 1. If no-one objects, I will change this number to two concurrent jobs. Cheers, Lars