Re: [iagi-net-l] Geology and Alteration-Mineralization Characteristicsof the CibaliungEpithermal Gold Deposit, Banten, Indonesia

2003-02-24 Terurut Topik Sukmandaru Prihatmoko
Pak RDP,

Thanks untuk posting-an abstrak paper saya (dkk). Tapi saya perlu meluruskan
komentar anda. Sumberdaya yang ada di Cibaliung adalah 1.3 juta ton @ 10.42
g/t emas dan 60.7 g/t perak,  sudah jelas tersebut pada paper tsb. Artinya
1.3 mt adalah ore-nya (indicated+inferred) dan kandungan emasnya kira-kira
435.000 oz setara dengan 13 ton emas. Kalau 1.3 juta ton emas itu total
cadangan emas dunia... barangkali.

Glek...nyem-nyem... mungkin saat ini belum meski harga emas sempat
melambung (gara-gara kegetolan AS untuk nyerang Irak). Tapi untuk ukuran
tambang emas jumlah sumberdaya sebesar (sekecil) itu masih jauh dari
yang ditambang di Pongkor, Kelian, atau Gn. Muro.

Salam - Daru

- Original Message -
From: "PUTROHARI Rovicky" <[EMAIL PROTECTED]>
To: <[EMAIL PROTECTED]>
Sent: Tuesday, February 25, 2003 1:05 PM
Subject: [iagi-net-l] Geology and Alteration-Mineralization Characteristics
of the CibaliungEpithermal Gold Deposit, Banten, Indonesia


Wah kalo harga emas melambung seperti beberapa bulan lalu dengan 1.3 juta
tonnes emas
pasti glek nyem-nyem  ... :-)

rdp




-
To unsubscribe, e-mail: [EMAIL PROTECTED]
Visit IAGI Website: http://iagi.or.id
IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
IAGI-net Archive 2: http://groups.yahoo.com/group/iagi

Komisi Sedimentologi (FOSI) : F. Hasan Sidi([EMAIL PROTECTED])-http://fosi.iagi.or.id
Komisi SDM/Pendidikan : Edy Sunardi([EMAIL PROTECTED])
Komisi Karst : Hanang Samodra([EMAIL PROTECTED])
Komisi Sertifikasi : M. Suryowibowo([EMAIL PROTECTED])
Komisi OTODA : Ridwan Djamaluddin([EMAIL PROTECTED] atau [EMAIL PROTECTED]), Arif 
Zardi Dahlius([EMAIL PROTECTED])
Komisi Database Geologi : Aria A. Mulhadiono([EMAIL PROTECTED])
-



[iagi-net-l] Dicari: Pak Sahat Tobing

2003-02-24 Terurut Topik Siregar, Parvita
Ada yang bisa bantu saya mencari Pak Sahat Tobing?  Terakhir beliau bekerja di museum 
geologi/P3G.  Kalau ada yang bisa bantu saya tolong dikontak lewat japri.

Terimakasih.


Parvita H. Siregar
New Ventures Geologist
ConocoPhillips Indonesia
Menara Mulia, Jl. Jend. Gatot Subroto Kav.9-11
Jakarta 12930-Indonesia
TEL: (62-21) 521-0100 
FAX: (62-21) 524-1713
* mailto:[EMAIL PROTECTED]



-
To unsubscribe, e-mail: [EMAIL PROTECTED]
Visit IAGI Website: http://iagi.or.id
IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
IAGI-net Archive 2: http://groups.yahoo.com/group/iagi

Komisi Sedimentologi (FOSI) : F. Hasan Sidi([EMAIL PROTECTED])-http://fosi.iagi.or.id
Komisi SDM/Pendidikan : Edy Sunardi([EMAIL PROTECTED])
Komisi Karst : Hanang Samodra([EMAIL PROTECTED])
Komisi Sertifikasi : M. Suryowibowo([EMAIL PROTECTED])
Komisi OTODA : Ridwan Djamaluddin([EMAIL PROTECTED] atau [EMAIL PROTECTED]), Arif 
Zardi Dahlius([EMAIL PROTECTED])
Komisi Database Geologi : Aria A. Mulhadiono([EMAIL PROTECTED])
-



[iagi-net-l] Geology and Alteration-Mineralization Characteristics of the CibaliungEpithermal Gold Deposit, Banten, Indonesia

2003-02-24 Terurut Topik PUTROHARI Rovicky
Wah kalo harga emas melambung seperti beberapa bulan lalu dengan 1.3 juta 
tonnes emas 
pasti glek nyem-nyem  ... :-)

rdp

RESOURCE GEOLOGY, vol. 52, no. 4, 329- 339, 2002
Geology and Alteration-Mineralization Characteristics of the Cibaliung 
Epithermal Gold Deposit, Banten, Indonesia
Ciceron A. Angeles1, Sukmandaru Prihatmoko and James S. Walker2
PT Austindo Nusantara Jaya, Graha Irama, 3rd Floor, Jl. HR Rasuna Said, 
Kav. 1-2, Jakarta 12950, Indonesia [e-mail(SP):[EMAIL PROTECTED]
1 Present address: 38 Lemonwood St., Greenwoods Executive Village, Cainta, 
Rizal 1900, Philippines
2 Present address: P.O. Box 50713, Tucson, Arizona 85703, U.S.A.
Abstract: The Cibaliung gold project is located at the central portion of the 
Neogene Sunda-Banda magmatic arc. Gold-silver mineralization in the area 
is hosted in a thick sequence of sub-aqueous basaltic andesite volcanics 
with intercalated sediments intruded by sub-volcanic andesite to diorite 
plugs and dykes, and subsequently cut by a cluster of diatreme breccias. 
These host rocks are unconformably overlain by dacitic tuffs, younger 
sediments and basalt flows. 
The gold prospects in Cibaliung occur within a NW-trending structural 
corridor that is 3.5 km wide by at least 6 km long. It is fault-bounded 
and is considered to be a graben. Two aligned NNW-trending sub-vertical 
shoots, Cikoneng and Cibitung, host the currently defined resource within 
the steeply dipping vein system with a minimum strike length of 1,300 m. 
As of July 2001, exploration has defined an inferred + indicated mineral 
resource of approximately 1.3 million tonnes at 10.42 g/t gold and 60.7 
g/t silver at a 3 g/t Au cut-off. This equates to approximately 435,000 
ounces of gold and 2.54 million ounces of silver.
Gold-silver mineralization occurs as quartz veins characteristic of the 
low-sulphidation epithermal adularia-sericite type. Progressive dilation 
with a general increase in gold grade has produced multi-stage veining and 
brecciation that grades from early to late stages as: pre-mineral 
fluidized breccia, quartz vein stockwork, massive vein, crustiform vein, 
colloform-crustiform vein with progressive increase in chloritic clay 
bands, clay-quartz milled matrix breccias with a progressive increase in 
clay content, and syn- to post-mineral fault gouge with vein clasts. Wall 
rock alteration is characterized by prograde chlorite+adularia flooding 
that is locally overprinted by a low temperature argillic alteration 
(smectite, illite and mixed layered clays). Generally, the argillic 
alteration becomes weak with depth. The major mineral constituents of the 
veins are quartz, adularia and clay. In the early gold-poor hydrothermal 
stages, quartz and adularia dominate with minor calcite and clay 
(smectite, poorly crystalline chlorite, interlayered chlorite-smectite and 
illite-smectite). In the later gold-rich hydrothermal stages, clay with 
variable amounts of carbonate increases whereas the abundance of quartz 
and adularia decreases. Gold occurs mainly as electrum while silver occurs 
as argentite-aguilarite-naumannite and electrum, and rarely as native 
silver, sulphosalts and tellurides. Sulphides generally comprise <1 vol % 
of the vein, with pyrite as the most common species. Together with pyrite, 
traces of very fine-grained base metal sulphides dominated by 
chalcopyrite, sphalerite and galena are in most cases intimately 
associated with electrum and silver minerals. Partial supergene oxidation 
generally extends down to about 200 m below the surface at Cikoneng and 
further down to more than 300 m at Cibitung.
The hydrothermal system responsible for the gold-silver mineralization in 
the area may be related to rhyolitic magmatism focused on a volcanic 
intrusive center during back arc rifting that formed a graben or 
pull-apart basin. The dominant mechanism for the higher grade gold 
deposition is fluid mixing of up welling metal-bearing hydrothermal 
solutions with relatively near surface cool, oxygenated condensate and/or 
steam-heated meteoric fluids, as opposed to retrograde boiling. The 
strongly focused dilational structural environment is thought to have been 
the mechanism for focusing fluid flows, both up welling and descending, 
forming pipe-like mineralized bodies in the rhomboidal dilation zones. It 
is interpreted that mineralization took place under low temperature 
conditions (<150-220¡C) at a minimum depth of around 200-250 m below the 
palaeo-water table. Keywords:epithermal gold, low sulphidation, Cibaliung, Indonesia, 
Cikoneng, 
Cibitung, vein, dilation RESOURCE GEOLOGY, vol. 52, no. 4, 329- 339, 2002

-
To unsubscribe, e-mail: [EMAIL PROTECTED]
Visit IAGI Website: http://iagi.or.id
IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
IAGI-net Archive 2: http://groups.yahoo.com/group/iagi

Komisi Sedimentologi (FOSI) : F. Hasan Sidi([EMAIL PROTECTED])-http://f

[iagi-net-l] IPA TALK!!!

2003-02-24 Terurut Topik Titi Tabusalla
IPA PROFESSIONAL DIVISION TALK
Date: Wednesday, March 5, 2003
Time: 11:45 am
Venue: Sasono Mulyo 1, Lobby Level, Le Meridien Jakarta, Jl. Jend. Sudirman Kav. 
18-20, Jkt. 10220
Subject: 'SUMMARY OF E&P 2002"
Speaker: Zanial Achmad, Deputy Planning BP Migas
Cost: Rp.115.000 (IPA Member), Rp.135.000 (non member)
Reservation: By email: [EMAIL PROTECTED] or [EMAIL PROTECTED], by phone: 572-4284/5/6, 
by fax: 572-4259
We are looking forward to see all of you next week!

Cheers,
Titi Tabusalla
Phone: +62 (021) 5724284, 5724285
Email: [EMAIL PROTECTED]
Website: http://www.ipa.or.id





The 29th Annual Indonesian Petroleum Association (IPA)

Convention and Exhibition,
will be held
October 14-16, 2003 at the Jakarta Convention Center, Indonesia
Mark your agenda now,

Don't Miss the biggest Petroleum Industry Event in SE Asia!




Re: [iagi-net-l] Semiloka Infrastruktur Lintas Selat Sunda

2003-02-24 Terurut Topik Edy Gaffar

Terima kasih informasinya
saya berminat sekali untuk mengikutinya akan tetapi kami harus menghubungi siapa
dan kemana (maksudnya panitianya)
terima kasih
Eddy Gaffar
Puslit Geoteknologi-LIPI


Quoting [EMAIL PROTECTED]:

> 
> 
> 
> 
> Semiloka Infrastruktur Lintas Selat Sunda
> 
> Kamis 27 Pebruari 2003, Aula Barat - ITB
> 
> 
> 
> Kerjasama antara:
> 
> Lembaga Penelitian dan Pemberdayaan Masyarakat - Institut Teknologi
> Bandung
> Departemen Permukiman dan Prasarana Wilayah
> Departemen Perhubungan
> Badan Perencanaan Pembangunan Nasional
> 
> LATAR BELAKANG
> 
> Lalu lintas penyebrangan antara pulau Jawa dan pulau Sumatra yang saat ini
> dihubungkan oleh sistem penyeberangan ferry antara pelabuhan Merak dan
> Bakauheni setiap tahunnya memperlihatkan peningkatan pertumbuhan yang
> cukup tinggi. Namun, pertumbuhan lalu lintas tersebut ternyata tidak
> didukung oleh pertumbuhan yang memadai dari sarana penunjang di sub-sektor
> transportasi. Hal ini tentunya dapat berakibat pada kurang lancarnya
> sistem penyebrangan yang ada. Kondisi ini sangat terasa pada saat
> terjadinya lonjakan lalu lintas penyebrangan, khususnya pada masa-masa
> liburan. Selain karena lonjakan penumpang pada masa-masa tertentu, sistem
> penyebrangan ferry tersebut terkadang juga terganggu kelancarannya
> bilamana terjadi kondisi ombak yang besar. Padahal selat sunda yang
> menghubungkan Laut Jawa dengan Samudra Indonesia sering dilanda ombak yang
> besar. Pengadaan infrastruktur penghubung, berupa jembatan ataupun
> terowongan, untuk mengatasi kekurangan yang dimiliki oleh sistem
> penyebrangan yang ada dalam hal ini menjadi relevan. Dengan adanya
> infrastruktur penghubung, kegiatan ekonomi antar daerah-daerah yang
> dipisahkan oleh selat tersebut dapat berjalan dengan lebih lancar,
> sehingga dapat memacu pertumbuhan ekonomi di pulau Jawa dan Sumatera.
> Namun, diantara kedua pilihan jenis infrastruktur tersebut, yaitu
> terowongan dan jembatan, jenis mana yang paling sesuai untuk diterapkan di
> selat Sunda. Semiloka ini dibuat dengan tujuan untuk mengidentifikasi
> kelebihan dan kekurangan serta permasalahan yang mungkin timbul dari
> penerapan kedua jenis infrastruktur tersebut untuk menghubungkan Pulau
> Jawa  Sumatra. Aspek-aspek yang ditinjau meliputi aspek geologi,
> geoteknik, struktur, metoda pelaksanaan, transportasi, pembiayaan, safety,
> ketersediaan serta kemampuan sumber daya nasional dan lain-lain.
> 
> 
> TEMA
> 
> INFRASTRUKTUR LINTAS SELAT SUNDA
> 
> 
> WAKTU DAN TEMPAT
> 
> Semiloka akan diselenggarakan pada:
> Kamis, 27 Pebruari 2003
> Aula Barat ITB
> Jalan Ganesa No. 10
> 
> 
> 
> 
> -
> To unsubscribe, e-mail: [EMAIL PROTECTED]
> Visit IAGI Website: http://iagi.or.id
> IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
> IAGI-net Archive 2: http://groups.yahoo.com/group/iagi
> 
> Komisi Sedimentologi (FOSI) : F. Hasan
> Sidi([EMAIL PROTECTED])-http://fosi.iagi.or.id
> Komisi SDM/Pendidikan : Edy Sunardi([EMAIL PROTECTED])
> Komisi Karst : Hanang Samodra([EMAIL PROTECTED])
> Komisi Sertifikasi : M. Suryowibowo([EMAIL PROTECTED])
> Komisi OTODA : Ridwan Djamaluddin([EMAIL PROTECTED] atau [EMAIL PROTECTED]),
> Arif Zardi Dahlius([EMAIL PROTECTED])
> Komisi Database Geologi : Aria A. Mulhadiono([EMAIL PROTECTED])
> -
> 




---
This mail sent through: http://webmail.lipi.go.id/

-
To unsubscribe, e-mail: [EMAIL PROTECTED]
Visit IAGI Website: http://iagi.or.id
IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
IAGI-net Archive 2: http://groups.yahoo.com/group/iagi

Komisi Sedimentologi (FOSI) : F. Hasan Sidi([EMAIL PROTECTED])-http://fosi.iagi.or.id
Komisi SDM/Pendidikan : Edy Sunardi([EMAIL PROTECTED])
Komisi Karst : Hanang Samodra([EMAIL PROTECTED])
Komisi Sertifikasi : M. Suryowibowo([EMAIL PROTECTED])
Komisi OTODA : Ridwan Djamaluddin([EMAIL PROTECTED] atau [EMAIL PROTECTED]), Arif 
Zardi Dahlius([EMAIL PROTECTED])
Komisi Database Geologi : Aria A. Mulhadiono([EMAIL PROTECTED])
-



[iagi-net-l] Semiloka Infrastruktur Lintas Selat Sunda

2003-02-24 Terurut Topik HENDRAWAN_ARIEF




Semiloka Infrastruktur Lintas Selat Sunda

Kamis 27 Pebruari 2003, Aula Barat - ITB



Kerjasama antara:

Lembaga Penelitian dan Pemberdayaan Masyarakat - Institut Teknologi
Bandung
Departemen Permukiman dan Prasarana Wilayah
Departemen Perhubungan
Badan Perencanaan Pembangunan Nasional

LATAR BELAKANG

Lalu lintas penyebrangan antara pulau Jawa dan pulau Sumatra yang saat ini
dihubungkan oleh sistem penyeberangan ferry antara pelabuhan Merak dan
Bakauheni setiap tahunnya memperlihatkan peningkatan pertumbuhan yang
cukup tinggi. Namun, pertumbuhan lalu lintas tersebut ternyata tidak
didukung oleh pertumbuhan yang memadai dari sarana penunjang di sub-sektor
transportasi. Hal ini tentunya dapat berakibat pada kurang lancarnya
sistem penyebrangan yang ada. Kondisi ini sangat terasa pada saat
terjadinya lonjakan lalu lintas penyebrangan, khususnya pada masa-masa
liburan. Selain karena lonjakan penumpang pada masa-masa tertentu, sistem
penyebrangan ferry tersebut terkadang juga terganggu kelancarannya
bilamana terjadi kondisi ombak yang besar. Padahal selat sunda yang
menghubungkan Laut Jawa dengan Samudra Indonesia sering dilanda ombak yang
besar. Pengadaan infrastruktur penghubung, berupa jembatan ataupun
terowongan, untuk mengatasi kekurangan yang dimiliki oleh sistem
penyebrangan yang ada dalam hal ini menjadi relevan. Dengan adanya
infrastruktur penghubung, kegiatan ekonomi antar daerah-daerah yang
dipisahkan oleh selat tersebut dapat berjalan dengan lebih lancar,
sehingga dapat memacu pertumbuhan ekonomi di pulau Jawa dan Sumatera.
Namun, diantara kedua pilihan jenis infrastruktur tersebut, yaitu
terowongan dan jembatan, jenis mana yang paling sesuai untuk diterapkan di
selat Sunda. Semiloka ini dibuat dengan tujuan untuk mengidentifikasi
kelebihan dan kekurangan serta permasalahan yang mungkin timbul dari
penerapan kedua jenis infrastruktur tersebut untuk menghubungkan Pulau
Jawa  Sumatra. Aspek-aspek yang ditinjau meliputi aspek geologi,
geoteknik, struktur, metoda pelaksanaan, transportasi, pembiayaan, safety,
ketersediaan serta kemampuan sumber daya nasional dan lain-lain.


TEMA

INFRASTRUKTUR LINTAS SELAT SUNDA


WAKTU DAN TEMPAT

Semiloka akan diselenggarakan pada:
Kamis, 27 Pebruari 2003
Aula Barat ITB
Jalan Ganesa No. 10




-
To unsubscribe, e-mail: [EMAIL PROTECTED]
Visit IAGI Website: http://iagi.or.id
IAGI-net Archive 1: http://www.mail-archive.com/iagi-net%40iagi.or.id/
IAGI-net Archive 2: http://groups.yahoo.com/group/iagi

Komisi Sedimentologi (FOSI) : F. Hasan Sidi([EMAIL PROTECTED])-http://fosi.iagi.or.id
Komisi SDM/Pendidikan : Edy Sunardi([EMAIL PROTECTED])
Komisi Karst : Hanang Samodra([EMAIL PROTECTED])
Komisi Sertifikasi : M. Suryowibowo([EMAIL PROTECTED])
Komisi OTODA : Ridwan Djamaluddin([EMAIL PROTECTED] atau [EMAIL PROTECTED]), Arif 
Zardi Dahlius([EMAIL PROTECTED])
Komisi Database Geologi : Aria A. Mulhadiono([EMAIL PROTECTED])
-