[jira] [Updated] (HBASE-19758) Split TestHCM to several smaller tests

2018-01-11 Thread stack (JIRA)

 [ 
https://issues.apache.org/jira/browse/HBASE-19758?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-19758:
--
   Resolution: Fixed
 Hadoop Flags: Reviewed
Fix Version/s: 2.0.0-beta-1
   Status: Resolved  (was: Patch Available)

Pushed this nice refactoring to branch-2 and master.

> Split TestHCM to several smaller tests
> --
>
> Key: HBASE-19758
> URL: https://issues.apache.org/jira/browse/HBASE-19758
> Project: HBase
>  Issue Type: Improvement
>  Components: test
>Reporter: Duo Zhang
>Assignee: Duo Zhang
> Fix For: 2.0.0-beta-1
>
> Attachments: HBASE-19758.patch, HBASE-19758.patch
>
>
> It takes too much time to finish, especially the timeout related tests. We 
> should move these tests out.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Updated] (HBASE-19758) Split TestHCM to several smaller tests

2018-01-11 Thread stack (JIRA)

 [ 
https://issues.apache.org/jira/browse/HBASE-19758?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-19758:
--
Attachment: HBASE-19758.patch

Retry

> Split TestHCM to several smaller tests
> --
>
> Key: HBASE-19758
> URL: https://issues.apache.org/jira/browse/HBASE-19758
> Project: HBase
>  Issue Type: Improvement
>  Components: test
>Reporter: Duo Zhang
>Assignee: Duo Zhang
> Attachments: HBASE-19758.patch, HBASE-19758.patch
>
>
> It takes too much time to finish, especially the timeout related tests. We 
> should move these tests out.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Updated] (HBASE-19758) Split TestHCM to several smaller tests

2018-01-11 Thread Duo Zhang (JIRA)

 [ 
https://issues.apache.org/jira/browse/HBASE-19758?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang updated HBASE-19758:
--
Assignee: Duo Zhang
  Status: Patch Available  (was: Open)

> Split TestHCM to several smaller tests
> --
>
> Key: HBASE-19758
> URL: https://issues.apache.org/jira/browse/HBASE-19758
> Project: HBase
>  Issue Type: Improvement
>  Components: test
>Reporter: Duo Zhang
>Assignee: Duo Zhang
> Attachments: HBASE-19758.patch
>
>
> It takes too much time to finish, especially the timeout related tests. We 
> should move these tests out.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)


[jira] [Updated] (HBASE-19758) Split TestHCM to several smaller tests

2018-01-11 Thread Duo Zhang (JIRA)

 [ 
https://issues.apache.org/jira/browse/HBASE-19758?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang updated HBASE-19758:
--
Attachment: HBASE-19758.patch

> Split TestHCM to several smaller tests
> --
>
> Key: HBASE-19758
> URL: https://issues.apache.org/jira/browse/HBASE-19758
> Project: HBase
>  Issue Type: Improvement
>  Components: test
>Reporter: Duo Zhang
> Attachments: HBASE-19758.patch
>
>
> It takes too much time to finish, especially the timeout related tests. We 
> should move these tests out.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)