Re: [Vo]:Rossi Says .. (believe it or not)

2012-11-21 Thread Alan Fletcher
Andrea Rossi
November 21st, 2012 at 10:09 AM

Dear Clovis Alan Ray:
You merit this info: yesterday the third party validation of the Hot Cat has 
been completed.
Has been good.
The results have been better that in the July 16th preliminary test.
We are presently manufacturing 3 1 MW E-Cats:
1- Low Temperature 1 MW E-Cat
1- 1 MW Hot Cat
1- 1 MW Hot Cat gas fueled
A Report will be published after peer reviewing.
We are working very hard.
Warm Regards,
A.R.



Re: [Vo]:Rossi Says .. (believe it or not)

2012-11-21 Thread Terry Blanton
Rossi has peers?



Re: [Vo]:Rossi Says .. (believe it or not)

2012-11-21 Thread Harry Veeder
and they are covered in barnacles
harry

On Wed, Nov 21, 2012 at 12:55 PM, Terry Blanton hohlr...@gmail.com wrote:
 Rossi has peers?




[Vo]:Rossi Says .. (believe it or not)

2012-11-18 Thread Alan Fletcher
Andrea Rossi
November 15th, 2012 at 2:11 PM

Dear Mark Saker:
1- The prototype we are making, fueled by gas, will weight about 1 tonn (I 
hope).
2- If we will be able to make 1 MW/tonn I will be very happy.
3- The prototype we are making will be (gas fueled) 2 meters long, 1 meter 
wide, 1 meter hight (I hope). These dimensions will enclose the primary fluid 
ready to go to the heat exchanger to heat the secondary circuit’s fluid.
That’s what I hope and to make the hope reality we are working like Americans 
in the Navy’s factories in the year 1942, after Pearl Harbour.
Warm Regards,
A.R.

- - - - -

3- you are right, but the 6 mo replace will be extended to a longer time as 
soon as we will get enough experience. It is a conservative choice. By the way, 
we would arrive to a time extension that will allow us to replace the whole 
module and sell as scrap the old one, after recovering the charge to recycle.

- - - - 

Passi via peswiki via google translate : 
http://pesn.com/2012/11/15/9602221_LENR-to-Market_Weekly_November15/

A small communication - you still have a little 'patience for news on the E-Cat 
who wait - I like the look - for months and months. I can now tell you that:
- those independent tests so much expected and returned are now almost 
concluded;
- experimental setting, instrumentation (National Instruments, of course), 
calibration, procedures, records and so on. this time were bomb-proof;
- is the time required to document and communicate all in the standard mode 
used by the scientific community and those responsible for it will certainly 
test as accurately as possible. (22Passi; November 7, 2012)

- - - - -

Perhaps Still this Month - Here's a little bulletin from Daniele Passerini on 
22passi.blogspot.com regarding the long-awaited hot cat validation report. 
(Thanks to ECW reader Renzo for the non-google translation from the original 
Italian!) Please have a little patience for news about the E-Cat that you've 
been waiting – as I do – for months after months. I can... (E-CatWorld; 
November 9, 2012)