Hi,
We are getting Max BOM Level reached error while generating Master schedule.
We have set up the BOM Parameter Max level 40.Our BOM s have maximum 10
levels.Is there any report or method to check circularity and correct.
Thanks in advance
Best Regards
Pramod
-Knowledge-Village@yahoogroups.com
[mailto:[EMAIL PROTECTED] vegne af Philip R.
Freimann
Sendt: 5. august 2005 16:42
Til: Axapta-Knowledge-Village@yahoogroups.com
Emne: [Axapta-Knowledge-Village] Master Scheduling: Error Messages
I have the following error messages at the end of the Master
scheduling
I have the following error messages at the end of the Master
scheduling run. There are no item specific error messages. These
are the only messages. Can someone tell me what they mean? Do they
mean the explosion did not complete? If so where did it stop or how
much did it complete?
"Master
3 matches
Mail list logo