[Axapta-Knowledge-Village] Master scheduling Error

2006-11-19 Thread samuel pramod
Hi, We are getting Max BOM Level reached error while generating Master schedule. We have set up the BOM Parameter Max level 40.Our BOM s have maximum 10 levels.Is there any report or method to check circularity and correct. Thanks in advance Best Regards Pramod

RE: [Axapta-Knowledge-Village] Master Scheduling: Error Messages

2005-08-05 Thread Jens Strandberg
-Knowledge-Village@yahoogroups.com [mailto:[EMAIL PROTECTED] vegne af Philip R. Freimann Sendt: 5. august 2005 16:42 Til: Axapta-Knowledge-Village@yahoogroups.com Emne: [Axapta-Knowledge-Village] Master Scheduling: Error Messages I have the following error messages at the end of the Master scheduling

[Axapta-Knowledge-Village] Master Scheduling: Error Messages

2005-08-05 Thread Philip R. Freimann
I have the following error messages at the end of the Master scheduling run. There are no item specific error messages. These are the only messages. Can someone tell me what they mean? Do they mean the explosion did not complete? If so where did it stop or how much did it complete? "Master