Does anybody know if the ios of the 3550's supports or will support ipx ?
and at?
thanks
Diego Rissone
CCIP,CCDP,CCNP,MSCE+I
TECHINT GROUP -ARGENTINA
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=53642&t=53642
-
4232 L3 service blade functions only with the supii , no?
regards - Diego CCIP, CCDP, CNNP
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=51855&t=51799
--
FAQ, list archives, and subscription info: http://www.groupstudy.com/lis
i run a similar problem a couple of months ago
try this
install the 8mb flash simm that have the ios image you want to boot in the
first flash bank and put the second flash simm in the second bank.
delete any file that resides in the second flash simm ( i can´t remember now
if once must delet
really i need to have both routes for load balancing
the problem is that only one link runs a routing proto and the other not
i agree with you folks that the term metric of a static route is strange but
i have no other term to describe the situation
regards- Diego
Message Posted at:
http://www
yes chuck what you said is the only solution i implemented to this issue
it´s tweaky but possible . one must take in account not only the feasible
distance ( or metric ) of the distribution but also to set the
administrative distance to be 90 for this specific operation so the router
installs bo
Sanchez
is right what you said
but one thing is the administrative distance and the other is the metric .
my concern is with the metric itself. as far as i know the metric can´t be
modified for a static route
regards - Diego
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=501
Is there a way to configure a metric to a static route?
One can configure the administrative distance.
I have a situation where i want to have 2 routes in the routing table , one
learned by eigrp and the other a static one
the problem is even if i configure the ad of the static with 90 , only
The % of interrupt cpu is due to all interrupts being issued to the cpu .
for the most part this value is due to an interrupt context switching method
( fast , optimun ,cef, netflow , etc) and also accounts for the usage of
interrupts in the first part of a processs context switching method ( i.e
I have a doubt
If i register for the 350-001 tomorrow and take it before aug 7 th, let's
say the next friday, i will be tested on the old contents or the new ones ?
thanks
Diego
ccip,ccdp,ccnp
Techint Corp - Argentina
Message Posted at:
http://www.groupstudy.com/form/read.php?f=7&i=5007
9 matches
Mail list logo